Language
  • English (US)
  • Español
  • MAKE SURE YOUR FOREMAN DISCUSSES THE JHA WITH YOU BEFORE STARTING WORK ON THE JOB SITE. THEN YOU'LL SIGN YOUR NAME ON YOUR FOREMAN'S PHONE

  • ACTIVITY: LADDERS
    POTENTIAL SAFETY RISKS: FALLS, SLIPS, OBJECTS FALLING
    MITIGATION OF POTENTIAL RISKS:
    (A) LADDERS MUST BE SECURED
    (B) LADDERS WILL EXTEND A MINIMUM OF 36" ABOVE THE PLATFORM BEING ACCESSED
    (C) DEFECTIVE LADDERS WILL BE RED TAGGED AND REMOVED FROM SERVICE
    (D) LADDER OPENINGS WILL BE GUARDED WITH GUARD RAILS AND TOEBOARDS WITH THE OPENING RAIL OFFSET SO A WORKER CANNOT WALK DIRECTLY INTO THE OPENING, OR HAVE A REMOVABLE GUARDRAIL
    (E)WHEN CLIMBING THE LADDER, 3 POINTS OF CONTACT MUST ALWAYS BE MAINTAINED
    (F) A-FRAME LADDERS WILL BE FULLY OPENED, LEVEL AND ONLY USED ON THE APPROVED RUNG
    (G) MATERIALS, TOOLS, OR OBJECTS MUST BE HOISTED UP/DOWN THE ROOF

  • Image-79
  • ACTIVITY: HEAT ILLNESS
    POTENTIAL SAFETY RISKS: HEAT CRAMPS, HEAT EXHAUSTION, HEAT STROKE
    MITIGATION OF POTENTIAL RISKS:
    (A) PROVIDE TRAINING TO ALL EMPLOYEES HOW TO IDENTIFY SYMPTOMS OF HEAT ILLNESS/ STROKE.
    (B) EDUCATE THE IMPORTANCE OF HYDRATION
    (C) PROVIDE ONE QUART OF WATER PER HOUR FOR EACH EMPLOYEE
    (D) PROVIDE SHADE FOR BREAKS
    (E) WATCH FOR SIGNS OF HEAT ILLNESS
    (F) SHADE STRUCTURES WILL BE PROVIDED FOR COOL DOWN REST PERIODS

  • Image-80
  • ACTIVITY: ALL OPERATIONS PPE
    POTENTIAL SAFETY RISKS: FALLS, STRUCK BY, STRUCK AGAINST, FLYING OBJECTS, BURNS, CUTS, NOISE, DUST
    MITIGATION OF POTENTIAL RISKS:
    (A) HARD HATS 100%
    (B) ANSI 87+ EYE PROTECTION 100%
    (C) HEARING PROTECTION DURING CUTTING OPERATIONS
    (D) LONG PANTS
    (E) WORK BOOTS
    (F) FALL PROTECTION AT HEIGHTS WARRANTED
    (G) HAND PROTECTION WHEN NEEDED
    (H) ALL PPE TO BE INSPECTED DAILY

     
  • Image-84
  • ACTIVITY: SILICA
    POTENTIAL SAFETY RISKS: RESPIRATORY HAZARD THROUGH INHALATION
    MITIGATION OF POTENTIAL RISKS:
    (A) APF 10 MASK MAY BE REQUIRED WHILE SCILICA IS PRESENT

  • Image-81
  • ACTIVITY: LIFTING
    POTENTIAL SAFETY RISKS:STRAIN, SPRAIN, HERNIA
    MITIGATION OF POTENTIAL RISKS: 
    (A) FOLLOW PROPER LIFTING TECHNIQUES, BENDING AT KNEES, LIFTING WITH LEG MUSCLES, NOT TWISTING OR JERKING LOADS, MAINTAIN THE LOAD CLOSE TO THE BODY
    (B) USE ASSISTANCE OR EQUIPMENT FOR MOVING MATERIALS WHEN REQUIRED.

  • Image-82
  • ACTIVITY: ELECTRICAL 
    POTENTIAL SAFETY RISKS:BURNS, SHOCK, ELECTROCUTION
    MITIGATION OF POTENTIAL RISKS:
    (A) ALL ELECTRICAL EQUIPMENT WILL BE GROUNDED AND DOUBLE INSULATED
    (B) ANSI APPROVED EXTENSION CORDS
    (C) GFCI GENERATORS
    (D) SAFE DISTANCE WILL BE MAINTAINED FROM ALL POWER LINES ACCORDING TO THEIR VOLTAGE (10' MINIMUM)
    (E) INSPECT ALL ELECTRICAL EQUIPMENT PRIOR TO USE

     
  • Image-83
  • ACTIVITY: CONVEYOR TRUCK
    POTENTIAL SAFETY RISKS:PINCH, PULL, FALLS
    MITIGATION OF POTENTIAL RISKS:
    (A) OPERATOR MUST ENSURE ALL MANUFACTURER'S GUARDS ARE IN PLACE
    (B) NO LOOSE CLOTHING WHEN CONVEYOR IS BEING OPERATED
    (C) CONVEYOR BED PRESENTS A FALL HAZARD. LOADER SHOULD BE AWARE AND STAY AWAY FROM THE EDGE AT ALL TIMES. NEVER SHOULD THERE BE LIFTING, TWISTING, BACKING NEAR THE EDGE
    (D) NO RIDING THE CONVEYOR
    (E) EMPLOYEES RECEIVING MATERIALS MUST USE PERSONAL FALL PROTECTION.

     
  • ACTIVITY: HAZARDOUS MATERIALS USE
    POTENTIAL SAFETY RISKS:RESPIRATORY IRRITANT, DIZZINESS, HEADACHE
    MITIGATION OF POTENTIAL RISKS:
    (A) WHEN REQUIRED BY THE SDS RESPIRATORY PROTECTION WILL BE USED
    (B) EMPLOYEES REQUIRED TO DON A RESPIRATOR SHALL BE TRAINED AND FIT TESTED.
    (C) THE MANUFACTURER'S GUIDELINES WILL BE FOLLOWED REGARDING INSPECTION, USE, AND STORAGE.
    (D) THE FILTER REQUIRED PER THE SDS SHALL BE USED.

     
  • {whosThe}, PLEASE FILL OUT THE INFO BELOW

     
  • {whosThe} MUST VERIFY ALL NAMES ARE CORRECT AND EVERYONE HAS SIGNED, THEN FOREMEN WILL SIGN LAST

     
  • Clear
  • Clear
  • Clear
  • Clear
  • Clear
  • Clear
  • Clear
  • Clear
  • Clear
  • Clear
  • Clear
  •  - -
  • Should be Empty: