Freedom Heat Pumps - Heat Loss Connect Logo
Language
  • English (UK)
  • Español
  • Deutsch
  • Italiano
  • Nederlands
  • Arabic‬‎
  • Russian
  • Chinese (Simplified Han)
  • Gujarati
  • Welsh (Cymraeg)
  • Norwegian Nynorsk
  • Urdu
  • Polski
  • Français
  • Freedom Heat Pumps Heat Loss - Connect

    Building Room- by -Room Heat Loss Survey Form
  • How to complete this form

    1. Complete Contact Details 2. Complete Main Building Construction Details 3. Complete Extension Details 4. Enter Individual Room Details (Up to 15 Spaces) 5. Submit NOTE: If fields are left blank we will not receive the field information in the boxes
  • CONTACT DETAILS

    Contact Details for Person/Company/Surveyor
  • Main Building Construction Details

    Enter all the build details about the main property itself
  • Building Extensions

    If no extensions then leave blank and click 'NEXT' at bottom of page
  • Room 1 - Survey Measurements

    Complete each applicable dimension
  • VAULTED ROOM

    Insert Vaulted Type & Individual Measurements Below
  • Under Floor Heating

    If there is currently UFH installed detail pipe spacings and floor makeup/covering type
  • Radiators - If there are current radiators detail them in this section

    Detail the Type & Size - Include what could fit allow 100mm gap each side & 100mm Top/Bottom
  • Room 2 - Survey Measurements

    Complete each applicable dimension
  • VAULTED ROOM

    Insert Vaulted Type & Individual Measurements Below
  • Under Floor Heating

    If there is currently UFH installed detail pipe spacings and floor makeup/covering type
  • Radiators - If there are current radiators detail them in this section

    Detail the Type & Size - Include what could fit allow 100mm gap each side & 100mm Top/Bottom
  • Room 3 - Survey Measurements

    Complete each applicable dimension
  • VAULTED ROOM

    Insert Vaulted Type & Individual Measurements Below
  • Under Floor Heating

    If there is currently UFH installed detail pipe spacings and floor makeup/covering type
  • Radiators - If there are current radiators detail them in this section

    Detail the Type & Size - Include what could fit allow 100mm gap each side & 100mm Top/Bottom
  • Room 4 - Survey Measurements

    Complete each applicable dimension
  • VAULTED ROOM

    Insert Vaulted Type & Individual Measurements Below
  • Under Floor Heating

    If there is currently UFH installed detail pipe spacings and floor makeup/covering type
  • Radiators - If there are current radiators detail them in this section

    Detail the Type & Size - Include what could fit allow 100mm gap each side & 100mm Top/Bottom
  • Room 5 - Survey Measurements

    Complete each applicable dimension
  • VAULTED ROOM

    Insert Vaulted Type & Individual Measurements Below
  • Under Floor Heating

    If there is currently UFH installed detail pipe spacings and floor makeup/covering type
  • Radiators - If there are current radiators detail them in this section

    Detail the Type & Size - Include what could fit allow 100mm gap each side & 100mm Top/Bottom
  • Room 6 - Survey Measurements

    Complete each applicable dimension
  • VAULTED ROOM

    Insert Vaulted Type & Individual Measurements Below
  • Under Floor Heating

    If there is currently UFH installed detail pipe spacings and floor makeup/covering type
  • Radiators - If there are current radiators detail them in this section

    Detail the Type & Size - Include what could fit allow 100mm gap each side & 100mm Top/Bottom
  • Room 7 - Survey Measurements

    Complete each applicable dimension
  • VAULTED ROOM

    Insert Vaulted Type & Individual Measurements Below
  • Under Floor Heating

    If there is currently UFH installed detail pipe spacings and floor makeup/covering type
  • Radiators - If there are current radiators detail them in this section

    Detail the Type & Size - Include what could fit allow 100mm gap each side & 100mm Top/Bottom
  • Room 8 - Survey Measurements

    Complete each applicable dimension
  • VAULTED ROOM

    Insert Vaulted Type & Individual Measurements Below
  • Under Floor Heating

    If there is currently UFH installed detail pipe spacings and floor makeup/covering type
  • Radiators - If there are current radiators detail them in this section

    Detail the Type & Size - Include what could fit allow 100mm gap each side & 100mm Top/Bottom
  • Room 9 - Survey Measurements

    Complete each applicable dimension
  • VAULTED ROOM

    Insert Vaulted Type & Individual Measurements Below
  • Under Floor Heating

    If there is currently UFH installed detail pipe spacings and floor makeup/covering type
  • Radiators - If there are current radiators detail them in this section

    Detail the Type & Size - Include what could fit allow 100mm gap each side & 100mm Top/Bottom
  • Room 10 - Survey Measurements

    Complete each applicable dimension
  • VAULTED ROOM

    Insert Vaulted Type & Individual Measurements Below
  • Under Floor Heating

    If there is currently UFH installed detail pipe spacings and floor makeup/covering type
  • Radiators - If there are current radiators detail them in this section

    Detail the Type & Size - Include what could fit allow 100mm gap each side & 100mm Top/Bottom
  • Room 11 - Survey Measurements

    Complete each applicable dimension
  • VAULTED ROOM

    Insert Vaulted Type & Individual Measurements Below
  • Under Floor Heating

    If there is currently UFH installed detail pipe spacings and floor makeup/covering type
  • Radiators - If there are current radiators detail them in this section

    Detail the Type & Size - Include what could fit allow 100mm gap each side & 100mm Top/Bottom
  • Room 12 - Survey Measurements

    Complete each applicable dimension
  • VAULTED ROOM

    Insert Vaulted Type & Individual Measurements Below
  • Under Floor Heating

    If there is currently UFH installed detail pipe spacings and floor makeup/covering type
  • Radiators - If there are current radiators detail them in this section

    Detail the Type & Size - Include what could fit allow 100mm gap each side & 100mm Top/Bottom
  • Room 13 - Survey Measurements

    Complete each applicable dimension
  • VAULTED ROOM

    Insert Vaulted Type & Individual Measurements Below
  • Under Floor Heating

    If there is currently UFH installed detail pipe spacings and floor makeup/covering type
  • Radiators - If there are current radiators detail them in this section

    Detail the Type & Size - Include what could fit allow 100mm gap each side & 100mm Top/Bottom
  • Room 14 - Survey Measurements

    Complete each applicable dimension
  • VAULTED ROOM

    Insert Vaulted Type & Individual Measurements Below
  • Under Floor Heating

    If there is currently UFH installed detail pipe spacings and floor makeup/covering type
  • Radiators - If there are current radiators detail them in this section

    Detail the Type & Size - Include what could fit allow 100mm gap each side & 100mm Top/Bottom
  • Room 15 - Survey Measurements

    Complete each applicable dimension
  • VAULTED ROOM

    Insert Vaulted Type & Individual Measurements Below
  • Under Floor Heating

    If there is currently UFH installed detail pipe spacings and floor makeup/covering type
  • Radiators - If there are current radiators detail them in this section

    Detail the Type & Size - Include what could fit allow 100mm gap each side & 100mm Top/Bottom
  • Acoustic Performance - MCS020

    Enter some basic Details about where the outdoor unit is located and distance between the Outdoor unit and the assessment position
  • Standard Radiator Types

  • Radiators Checklist
  • Vaulted Rooms Types 1-4

  • Image-1551
  • Vaulted Rooms Types 5-8

  • Image-1552
  • Before Submission Please Check That All Pages Are Correct!

    The heat loss calculations and subsequent radiator/UFH selections are provided based on the survey information provided to us using this form. Should any of the information provided be incorrect this will adversley affect the calculation outcomes. We cannot be held responsible for Heat Loss Connect calculations provided via incorrectly submitted survey information.
  • Should be Empty: