Driveway Approach Permit Form
  • Homeowner Info

  •  -
  • Contractor Info

  •  -
  • NOTE IF APPROVED: CONSTRUCTION, REPLACEMENT OR REPAIRS MUST BEGIN WITHIN 5 DAYS OF PERMIT ISSUANCE. SIDEWALK SHALL BE REPLACED, OR REPAIRED AND REOPENED WITHIN 7 DAYS OF CONCRETE POUR BACK.

  • Project Outline

    • AT LEAST 24 HOURS NOTICE MUST BE GIVEN TO THE ASSIGNED INSPECTOR PRIOR TO WORK STARTING. A COPY OF THE APPROVED PERMIT MUST BE ON THE JOB SITE AT ALL TIMES. FAILURE TO DO SO MAY RESULT IN A FINE.
    • A COPY OF CERTIFICATE OF LIABILITY ATTACHED TO PERMIT REQUEST
    • PLEASE REFER TO THE CITY'S STANDARDS AND SPECIFICATIONS TO ENSURE ALL CONSTRUCTION IS IN ACCORDANCE WITH CITY CODE: https://www.lehi-ut.gov/government/public-meetings/planning/design-standards/
  •  - -
  • Image field 51
  • Image field 52
  • Image field 53
  • Image field 56
  • Should be Empty: