  • Galooli Installation Form

    Galooli Installation Form

    Based on Generic Layout
  • Time Stamp
     / /
     :
    • Site Layout 
    • Details of the devices available on the site
    • No. of Generators
    • How the Grid will be monitored?
    • How the ATS (Automatic Switch) will be monitored?
    • How the Solar Panels will be monitored?
    • No. of Fuel Tanks
    • No. of Shelters
    • A/C Rings
    • Smart Batteries
    • Temperature Sensors
    • No. of Door Sensors
    • No. of Rectifiers
    • Smart Batteries
    • Are There Tenants on Site
    • Elara Setup 
    • Image field 180
    • Image field 291
    • Hatch Switch Setup 
    • Image field 284
    • Image field 177
    • Image field 283
    • Extension Setup - EX20 Device  
    • Image field 420
    • Special Notes Concerning the Tray/ DB Box

      The highlighted area is the location of the dedicated cable entry points within the tray - this is where the technician will route the cables coming from all of the monitored sensors on site through the compression glands provided, ultimately ending at the Terminal Blocks.
    • Image field 298
    • Generator 1 
    • Does the Generator have a Panel
    • Does the Panel have a relay
    • Generator AC meter installed
    • Generator 2 
    • Does the Generator have a Panel
    • Does the Panel have a relay
    • Generator AC meter installed
    • Generator Relay  
    • Image field 350
    • Image field 352
    • On Which Phase is the Relay connected
    • Grid Relay  
    • Image field 956
    • Image field 957
    • On Which Phase is the Relay connected
    • Energy Inverters & Charger Inverter 
    • AC Meter for Grid monitoring 
    • Image field 820
    • Image field 846
    • Image field 847
    • Upload or take photo
      Cancelof
    • Smart Batteries 
    • Model of Smart Batteries
    • Fuel Sensor Setup 
    • Image field 103
    • Tank 1

    • Image field 549
    • Rectangular Tank - 1

    • Image field 294
    • Hexagonal Tank - 1

    • Image field 588
    • Vertical Cylinder - 1

    • Image field 295
    • Horizontal Cylinder - 1

    • Image field 296
    • Tank 2

    • Image field 448
    • Rectangular Tank - 2

    • Image field 555
    • Hexagonal Tank - 2

    • Image field 592
    • Vertical Cylinder - 2

    • Image field 578
    • Horizontal Cylinder - 2

    • Image field 583
    • Air Conditioning (A/C) Setup  
    • Image field 403
    • Upload or take photo
      Cancelof
    • Temperature Sensor Setup 
    • Image field 198
    • Upload or take photo
      Cancelof
    • Door Sensor Setup 
    • Image field 429
    • Image field 431
    • Upload or take photo
      Cancelof
    • Tenants 
    • Type of Tenant
    • AC Meter for ATS/ AC Colo 
    • Image field 408
    • Upload or take photo
      Cancelof
    • Rectifier Communication Panel Setup  
    • DC Meter  
    • Image field 435
    • Image field 414
    • Image field 415
    • Upload or take photo
      Cancelof
    • List of Items Installed 
    • Form Submission 
    • Should be Empty: