Maine Root Soda Installation Checklist Form
Cava Street Address
*
Street Address
Street Address Line 2
City
State / Province
Postal / Zip Code
Name
*
First Name
Last Name
Email
example@example.com
Phone Number
Please enter a valid phone number.
Format: (000) 000-0000.
Date
*
-
Month
-
Day
Year
Date
Conduit & Tubing (Note: *Tubing is to be run by the Soda Install Tech, not the Construction Team*)
*
Rows
Completed
Not Completed
Conduit is 6-inches in diameter, does not have any 90 degree turns.
Conduit length in feet from Back Room to the Fountain
blanks
*
Water Supply
*
Rows
Completed
Not Completed
Dedicated water supply consists of copper piping 1/2" outer diameter terminated on a 1/2" female threaded brass shut off installed next to syrup BIB rack.
Water service is turned on, 40 PSI or above tested after water filtration
Back flow preventer installed by plumber according to local regulations
Product
*
Rows
Completed
Not Completed
Maine Root Soda syrups are ON-SITE
CO-2 is ON-SITE
Electrical
*
Rows
Completed
Not Completed
110 V 20 amp dual outlet on a dedicated breaker available for the fountain dispensing unit below the countertop
Second 110 V 20 amp unit available for the carbonator shelf in the back of the house next to the back in the box syrup rack
Additional Comments
Signature
*
Continue
Continue
Should be Empty: