2024 ACAF Pavement Award Application
Please have a high-resolution photo of the project and the smoothness report ready before beginning the application. Not all fields will be applicable to all awards. Please fill out the application carefully. If you have any issues at all, please contact dallain@acaf.org immediately.
Contractor Name
*
Award Category
*
Please Select
Florida Road Builder (A.P. Bolton)
Urban Road Builder
Rural Road Builder
Roads & Streets, FDOT
Roads & Streets, Non-FDOT
Specialty Projects
Location (Provide route name/number with starting and ending points. Provide city if Urban job)
*
Contract Number (Please fill in even if Non-FDOT work. If no contract number was given, input: 0)
*
Project ID (Please fill in even if Non-FDOT work. If no Project ID was given, input: 0)
*
FDOT District
*
Please Select
1
2
3
4
5
6
7
Turnpike
If a Non-FDOT or Special Project, list FDOT district that the work was completed within by location.
County
*
Nature of Project
*
Start Date
*
-
Month
-
Day
Year
Date
Completion Date
*
-
Month
-
Day
Year
Date
Length (ft)
If special project, please be sure add these
Width (ft)
Total Lane Miles
*
If project is a multi-lane interstate, this number will be the project start/end bounds x number of lanes
Back
Next
Save
Asphalt Mix Information
Pavement Details (Please ensure these details are accurate before submitting)
*
Mix Type
Thickness (in)
Tons Placed
Composite Pay Factor
Friction
Surface
Leveling
Base
Total Tons
*
Tonnage of all asphalt mix placed
Asphalt Plant Name/Location
Back
Next
Save
Contractor Staff
Project Manager
*
Plant Foreman
*
Road Foreman
*
QC Manager
*
QC Technician, Plant
QC Technician, Roadway
Additional Staff You Want To Recognize
Please list name and title, separated by comma's if adding multiple names.
Agency Staff
Resident Engineer
FDOT
Consultant CEI
Project Administrator
FDOT
Consultant CEI
Back
Next
Save
Smoothness & Quality
Ride Acceptance Spec
*
Please Select
Rolling Straight Edge (RSE)
Ride Number
IRI
No Ride Acceptance for Project
Smoothness Statistic
*
(e.g. 2 RSE deficiencies; Ride Number 4.4; 35 IRI)
How many patches were placed in final friction course?
*
Back
Next
Save
File Upload
For FDOT Projects, provide a copy of the Ride Number, IRI, or Straightedge Deficiency Report for friction course only
Browse Files
Drag and drop files here
Choose a file
Cancel
of
For non-FDOT projects, provide a letter of recommendation from the agency or owner.
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Please upload multiple high resolution photos of the project can be used for the awards banquet and promotional materials.
*
Browse Files
Drag and drop files here
Choose a file
Minimum size is 1920 x 1080. Minimum resolution is 72 DPI. Recommended DPI is 300 for magazine printing
Cancel
of
Back
Next
Save
Submission
Upon submission, the Association will verify that the project meets the requirements. A $250 application fee per project submitted will be sent by the end of April.
Your Name
*
First Name
Last Name
Email
*
example@example.com
Phone Number
*
Please enter a valid phone number.
Email Invoice to:
*
example@example.com
Signature
Save
Submit
Should be Empty: