  • The following information form should be completed and submitted to Tenco when our client is planning to generate their own electricity within an embedded network that we manage on their behalf.  Tenco will review the information submitted and discuss the matter with our client.  Only our client as the owner of the property and the underlying electrical infrastructure has the authority to provide approval for the generation system.

    Please provide all the requested information.  Incomplete applications may result in processing delays. Please also complete a comprehensive analysis of the hourly electricity consumptions patterns at the property coupled with the hourly forecasted output from the proposed generation.  If there is a possibility that generation output may be exported beyond the gate meter to the local network at any time, Tenco highly recommends that a separate distributed generation application be submitted to the local network company for their review and approval.

    Tenco also recommends that you contact the respective electricity retailer associated with the ICP referenced below to advise them that generation will be installed.  The retailer may need to have a bidirectional meter installed or the existing meter reprogrammed.

  • Site Details:

  • Distributed Generation Details:

  •  - -
  • Inverter Details

  • Technical Requirements

  • The inverter installer must be a qualified electrician and must be familiar with the installation requirements of the AS/NZS 4777 and AS/NZS 3000.

    The installer must be able to provide the property owner with a signed certificate of compliance on completion of the installation, confirming the installation has been installed in accordance with the requirements contained within the local network company’s connection and operation standards.

    The installer must ensure, and certify, that the inverter settings comply with the local network company’s connection and operation standards.  The applicable local network company will provide a current list of approved and compliant inverters on their website

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Clear
  • Disclaimer:  The Embedded Network Company Limited (t/a as Tenco) is collecting this information strictly in its capacity as an administrative manager of an embedded network.  Tenco does not own the embedded network or the proposed distributed generation system and accepts no liability (in contract, tort or otherwise).  Tenco is not responsible for reviewing whether the distributed generation system has sufficient safety measures or meets any rules or regulations imposed by any authority including the local network owner.  Both are the responsibility of the property owner and its nominated consultants (if any).