Roofing Quotes WA Contact of Work
Office 2/14 Main St, Osborne Park, WA 6017 | ACN 158615466 | ABN 54158615466
Consultant
Irwan
Tom
Daniel
Carl
Property Owner 1
Property Owner 2
Phone Number 1
Please enter a valid phone number.
Phone Number 2
Please enter a valid phone number.
Email 1
example@example.com
Email 2
example@example.com
Property Address
Street Address
Street Address Line 2
Suburb
Suburb
Post Code
Back
Next
Agreed Work Details
We authorise Roofing Quotes WA to proceed with the work set out below
Work Type
Restoration
Guttering
Re Roof
Repairs
Other
Restoration Details
Roof Type
Concrete Tile
Clay Tile
Zincalume
Colorbond
Tile Replacement
Tile Customer Supplied
Repoint Caps
Re-beds
Roof Size
Pitch
eg 30 degrees
Colour
Gutters/Downpipes/Fascia
Inclusions
Gutters
Downpipes
Fascia
Gutter Linear Meters (Single Story)
Gutter Linear Meters (Multi Story)
Gutter Colour
Gutter Type
Standard
Colonial
Slotted
Box
Straightline
Spreaders
Pops
Gutter Spout
Gutter Guard Linear Meters
Downpipe Profile
Standard Rectangle (95mm x 45mm)
Round 75mm
Round 100mm
Single Storey Number
Double Storey Number
Triple Storey Number
Downpipe Colour
Fascia Type
Timber
Colorbond
Fascia Single Storey Linear Meters
Fascia Multi Storey Linear Meters
Facia Colour
Re-Roof
Re-Roof (From)
Clay Tile
Concrete Tile
Colorbond
Colorbond Trimdek
Zincalume
Zincalume Trimdek
Asbestos
Decramastic Tiles
Re-Roof (To)
Clay Tile
Concrete Tile
Colorbond
Colorbond Trimdek
Zincalume
Zincalume Trimdek
Asbestos
Decramastic Tiles
Roof Size
Roof Pitch
eg 30 degrees
Valleys in Linear Meters
Standard Flashing in Linear Meters
Hookover Flashing in Linear Meters
Flashing Cut in to Brick Linear Meters
Secret Gutter in Linear Meters
Ridge Capping Linear Meters
Ridge Capping Type
Please Select
Roll type
3 Bend
Barge Capping Linear Meters
Barge Capping Type
Please Select
Roll type
Square
Barge Board Replacement Linear Meters
Scribe Board Replace Linear Meters
Sarking sqm
Anticon sqm
Anticon Type
Please Select
60mm (R1.3)
80mm (R1.8)
1000mm (R2.4)
Repairs
Ridgecap replacement
Ridgecap customer supplied
Tile Replacement
Tile Customer Supplied
Tile Type
Number of Rebeds
Number of Repoints
Roof Clean in SQM
Gutter Clean in Linear Meters
Valleys replace in LM
Bargeboards replace in LM
Bargeboard painting in LM
Scribe boards replaced in LM
Number of skylights replace or removed (customer supply only)
Number of Whirlybirds supply and install
Number of Flume supply and Install
Eaves supply and install sqm
Other
Soakwells, Roof Safety, Rubbish
Number of 1.40m Soakwells
Soakwell Service
Please Select
Cleanout
Supply Install
Edge Protection in LM
Harness Required
Please Select
Scaffold Towers (5m high by 2.5m wide)
Number of days for Cherry Picker hire
Rubbish Romoval
Standard
2m Bin
3m Bin
4m Bin
Provisional sum for other works
Notes and Commencement
Job Notes
Solar panel removal & replace by client
Yes
No
Pool heating remove & replace by client
Yes
No
Estimated Commencement Date
-
Day
-
Month
Year
Date
Commencement in Weeks
Photos and Attachments
Google Earth
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Property Photos
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Back
Next
Payment Details
Contract price (GST Inclusive)
Deposit (6.5%)
Site Inspection (13.5%)
Commencement (30.0%)
Balance on Completion (50.0%)
Owner 1 Signature
Owner 2 Signature
Witness Signature
This field will be used to send the amount to Stripe
Deposit Payment Amount
prev
next
( X )
AUD
Description
Credit Card Details
First Name
Last Name
Credit Card Number
Security Code
Card Expiration
Or if EFT transfer take photo of receipt
Submit
Should be Empty: