• ***Form is having an update***

    Please check back later.

    We apologize for the inconvenience.

  • Read more about electricity emission factors for grid-connected entities.

  • Incentive eligibility criteria: For details on program eligibility, please refer to choose.bchydro.com.

  • Customer information

  • Project information

  • Please complete a separate pre-screen application form for each project at each operational location.

  • Project details

  • 0/500
  • Low carbon electrification

  • Commercial building details

  • Electrification measure

  • Construction, building, and compliance

  • Code compliance and building loads reduction modeling is required prior to program application.

  • CleanBC & BC Hydro Industrial Electrification Program information

  • Project location: Provide the project site location co-ordinates.

  • Projects that have started prior to being offered Inudstrial Electrification (IE) funding are not eligible for the IE stream.

  • Additional terms and conditions

    • The Operator of each Reporting Operation associated with this project must have submitted emission reports under the Greenhouse Gas Industrial Reporting and Control Act (GGIRCA) in 2023, 2022, and 2021 and has taken all reasonable measures to comply with its requirements under GGIRCA. Note, in some cases, exceptions may be made for unsubmitted 2021 and 2022 reports – see the Industrial Electrification Program Guide for details.
    • The applicant must have paid carbon tax in relation to fuel consumed by the project Reporting Operation(s) in the 2023 calendar year.
    • The Project must be not required by provincial or federal laws that are in force as of the submission of the application, or, if the applicant is required to implement the Project, the Project must involve an earlier implementation than required by law.
  • Consent confirmation

  • Should be Empty: