Language
English (US)
Español
Overhead Power Line Training
2600
Training Instructor: George Bunker 970-632-4917
Course Duration:
23 Minutes
Date
*
-
Month
-
Day
Year
Date
Name
*
First Name
Last Name
Email
*
example@example.com
Phone Number
Are you taking this training while on the clock or on a paid bad weather day?
*
Yes
No
Are you taking this training on your own personal time away from the job and on unpaid time?
*
Yes
No
What job are you currently on?
*
Security question: What is the IWS email address of your superintendent?
*
example@example.com
Have you taken this training somewhere else within the past year?
Yes
No
Upload proof of training
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Overhead Power Line Training
This video must be watched in it entirety. All training submissions must have a duration entry registering a minimum of 20 minutes to be accepted.
Youtube
Test
1. By planning your work using a Job Hazard Analysis you can make sure any power lines in your work area will be recognized and communicated to all workers.
True
False
2. Electrocutions are a leading cause of ____ in the construction industry.
Death
Injuries
Spills
Damage Incidents
3. Overhead power lines are well insulated and they wont hurt you if contact is made.
True
False
4. Any covers or insulation on overhead powerlines is there for weather protection and not to protect humans from electrical contact.
True
False
5. The equipment that most often come into contact bwith powerlines is ____.
Cranes
Cars
Skid Steers
Pickup Trucks
6. Other equipment such as ____ are often involved with line strike accidents.
Manlifts
Excavators
Concrete Pumps
Backhoes
All the above
7. The human body is a conductor of electricity.
True
False
8. Trees, rain, and even air can conduct electricity and cause an arc.
True
False
9. Keep all parts of high reaching equipment a minimum of 10 feet away from overhead power lines that are 50kv or less.
True
False
10. Keep all parts of high reaching equipment a minimum of 35 feet away from overhead power lines that are over 50kv.
True
False
Submit
Should be Empty: