Hot Water Storage System: Commissioned Settings Logo
  • Hot Water Cylinder and Storage System Commissioning Checklist

    This commissioning checklist is to be completed in full by the competent person who commissioned the storage system as a means of demonstrating compliance with the appropriate Building Regulations. Failure to install and commission this equipment to our instructions may invalidate the warranty but does not affect statutory rights. Please note that this is ancillary to the commissioning checklist found in your installation manual, which must be filled out to validate the Benchmark warranty scheme.
    • Customer and Installer Details 
    •  -
    •  - -
    • Hot Water Cylinder Details 
  • Hot Water Storage System: Commissioned Settings

    This must be carried out by the professional that has carried out the installation and commission of the hot water cylinder. Failure to fill this form out accurately may invalidate the manufacturer's warranty.
    • Water Quality 
    • Please note, that not fitting a water softener in hard water areas will invalidate your manufacturer's warranty for the hot water tank.

    • System Settings 
    • Unvented System Safety Checklist 
    • Image-38
    • Hot Water System Declarations 
    • Take Picture
      Drag and drop files here
      Choose a file
      Cancelof
    • Powered by Jotform SignClear
    • Powered by Jotform SignClear
    • Should be Empty: