Checklist
Site Name
*
TECHNICANS DETAILS
Full name
*
Position
*
Date
-
Month
-
Day
Year
Date
Phone Number
*
E-mail
*
example@example.com
Pipework installed
Kempex Slide
Fusiotherm
uPVC
PVC(D)
Galvanised
Alkathene
HDPE
MDPE
Earthenware
Kempex Gas
Dux
Bute
Cast Iron
Copper
HYDRAULIC - SETOUT
Pipework run to Current Construction set drawings
Discharge units calculated for fixtures waste system
Copies of taps & fittings schedule supplied
Hot water supply lines run the shortest
Copies of taps & fittings set out schedule supplied
Fittings and Fixtures confirmed & on order?
Checked Soil and waste pipes for minimum fall
Hydraulics checked vs Architectural drawings
HYDRAULIC - PIPEWORK
Specified waste pipe work is acoustic lagged
Penetrations through fire cells are fire protected
All Joist Brackets or Reinforcement installed if required
Nog's and fixings installed for WC,WHB,SHW,HWC?
Penetrations through building paper are trade sealed
Vent penetration has been back flashed and sealed
All exposed pipe work is correctly labeled
Hot Water Ring main is thermally lagged
All pipe work clipped neatly and tidy
Waterman connected to water meter & building
Water main Supply is under 500kpa
All pipework secured/siliconed
Pre-line pluming inspection booked
FWG flange recessed into flooring and installed
HYDRAULIC - TEST & COMPLETION DOCUMENTS
Water tested to 1500kpa and loop not affect lining
Test plug & Gauge removed from pipe system
Checked for drips on water and waste piping
Picked up all left over material and removed from site
Soil and waste piping hydrostatic test (Flood Test)
Backflow certification complete/booked
Test plug & Gauge removed from pipe system
As built completed and handed in
Fire penetration Schedule completed
Gas pipe work tested to twice the working pressure
ADDITIONAL NOTES
*
Signature
*
Continue
Continue