*A complete set of drawings shall be submitted with this application, including the following: Equipment cut sheets including FACP, remote annunciator, monitoring method, all devices, all POCs, and battery calcs.
PLAN REVIEW, PERMIT AND INSPECTION FEE SCHEDULE
Equipment Number X Cost per item = Fee
Alarm control panel ________ $115.00 ______
Each remote annunciator ________ $ 23.50 ______
Each booster power supply ________ $ 23.50 ______
Each alarm/supervisory/auxiliary device point connection ________ $ 7.00 ______
Each notification device/speaker ________ $ 3.45 ______
TOTAL PERMIT FEE
1 inspection included in permit fee.
Additional inspections charged at $115.00 per hour, minimum of 1 hour charge.
Minimum permit fee $115.00 for minor system modifications (at discretion of reviewer)
All fees shall be paid before a permit can be issued, requests for inspections or approvals for occupancy.
Payments using a credit card will incur an additional 3% service fee.
Performing work without a permit, the permit fee is double (2X) times the normal applicable fee.