PRE-POUR CHECKLIST
SUSPENDED DECK FORMWORK INSPECTION
Company:
*
Project:
*
Date:
*
/
Year
/
Month
Day
Date
Superintendent:
*
Please Select
RD Tellei
Tytan Timoteo
Gordon Scruton
Formwork Foreman:
*
Please Select
Brandon Pagtulingan
Peter Pagaling
Detrick Rawlins
Jose Siababa
Solomon Siababa
Antonio Ortiz
Tryson Vincent
Ryan Lapenia
Junior Ricapor
Pour Watch:
*
Pour Location:
*
Reference Drawings:
*
INSPECTION ITEMS
1. PSI completed and signed off by all workers and foreman.
*
YES
NO
N/A
2. Safe work access identified.
*
YES
NO
N/A
3. Openings properly covered.
*
YES
NO
N/A
4. Access prohibited under suspended deck and is barricaded with caution tape and signage.
*
YES
NO
N/A
5. Pour Watch assigned to supervise area beneath active pour.
*
YES
NO
N/A
6. Formwork constructed/erected in accordance with engineered drawings.
*
YES
NO
N/A
7. Concrete specifications and permissible construction loads confirmed with engineered drawings.
*
YES
NO
N/A
8. Formwork materials and components have been verified for: proper type, grade, size, orientation, and manufacturers specifications.
*
YES
NO
N/A
9. Supporting structures/surfaces in good condition and free of defects.
*
YES
NO
N/A
10. Supporting structures/surfaces confirmed for strength to support construction loads.
*
YES
NO
N/A
11. All formwork materials and components are in good condition and free of defects.
*
YES
NO
N/A
12. Formwork has been constructed plumb, level, squared, tight, and free of visible gaps.
*
YES
NO
N/A
13. All connections checked for proper fit and are secure to formwork and/or supports.
*
YES
NO
N/A
14. COMMENTS/REMARKS:
Superintendent Signature:
*
Formwork Foreman Signature:
*
Pour Watch Signature:
*
Preview PDF
Submit
Should be Empty: