Driven Brands - Site Completion Checklist
  • Controls Completion Checklist

    Site Completed Checklist for CCS Lead to Complete Before Leaving
  • Date*
     - -
  • Your Information

    Who is the controls lead on site responsible for the work?
  • IMPORTANT

    All items in this checklist are required to be completed.
  • It is required that the client has agreed you are completed BEFORE continuing with this list.

  • Has the Washmore driver been scheduled to pickup the old/removed equipment?*
  • The driver should have been scheduled by now.

    Call your manager now and inform them before continuing with this list.
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Is there any damage to the old equipment you know of?*
  • Are there any additions to the inventory list of removed equipment?*
  • Project Completion Pictures

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Is the network rack installed and online?*
  • Are the new pay station(s) mounted, wired, and operational?*
  • Are the new gate(s) mounted, wired, and operational?*
  • Are the new RFID/LPR reader(s) mounted, wired, and operational?*
  • Is the new tunnel controller mounted, wired, and operational?*
  • Are the gate loops fully operational? Proximity (if applicable), safety, and merge (if applicable)?*
  • Are vehicles properly queuing, gates opening, and merging at the pay stations?*
  • Has the tunnel equipment been programmed and tested?*
  • Have you washed at least 75 test vehicles?*
  • Should be Empty: