Controls - Site Arrival Checklist
  • Site Arrival Checklist

    Site Arrival Checklist for CCS Lead to Complete
  • Date*
     - -
  • Your Information

    Who is the controls lead on site completing the work?
  • Current Site Condition (Pre Retrofit)

  • Is there any broken/damaged/not working equipment in the tunnel?*
  • Is there any broken/damaged/not working equipment in the equipment room?*
  • Do you see the new equipment on site?
  • Is there any obvious damage to the equipment?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Are all existing outputs working?*
  • Are all existing inputs working?*
  • Are all the functions labeled in the tunnel controller correctly firing the right equipment in the tunnel?*
  • Is the pulse switching working and not in simulated pulse?*
  • Is the anti-collision working?*
  • Are the photo eyes working?*
  • Are the gate loops working? You can test with the metal gate cover*
  • What equipment type is currently installed and about to be removed?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Should be Empty: