Project Registration Form_Atkins Library Tower   Logo
  • Interested Bidders

    Project Description: The J. Murrey Atkins Library was originally constructed in 1971 and is located at the heart of University of North Carolina Charlotte’s campus.  At over 300,000 SF Atkins Library is the main library on campus. The second and final phase of this project includes approximately 11,500 sqft of interior renovations required for ADA and Fire/Smoke System upgrades.  The existing elevator and portions of the shaft will be removed to expand the footprint and install larger elevators that meet current ADA codes. Additional renovations for ADA compliance and upgrades to the Fire/Smoke system will take place on floors 1 through 10. This phase also includes restroom renovations on floors 5 through 10.The anticipated schedule for construction of phase 1 is June 2024 to September 2025.
  • Key Things to Note:

    To be invited as a prime bidder, you must at a minimum, meet the following: 1) You MUST be prequalified and your prequalification limit MUST meet the minimum bonding capacity identified for the specific category. 2) If you are a joint venture, all firms named in the joint venture must be prequalified. 3) You MUST be registered by completing this form.
  • All Prime Bidders are required to prequalify using the State Construction Office Part A & Part B Forms

    Part A: CM at Risk 1st Tier Subcontractor Master Prequalification Form (Annual Submittal): Click Here To Complete Part A Form

    Part B: CM at Risk 1st Tier Subcontractor Prequalification (Project Specific Supplement): Click Here To Complete Part B Form

  • Should be Empty: