2024 Capital Projects Funding Application
  • 2024 CAPITAL PROJECTS FUNDING

    Application & Instructions
  • INSTRUCTIONS:

    The following are instructions for application for Pinellas County Tourist Development Council (TDC) Capital Projects Funding. It is very important to follow all instructions in the application, and to provide ALL requested support materials. Please read the application in its entirety. Complete every question in the application, or type “n/a” if a question is not applicable to you. Please refer to Florida Statutes § 125.0104, Pinellas County Code Sec. 118-32, and the Capital Projects Funding Program Guidelines if you have questions about the Program. The granting of funds under this program is discretionary and not an entitlement; not all eligible projects may receive funding.

     Applicants must submit:

    • Application certification and compliance statement (Application Section A) signed in the spaces indicated 
    • Application Sections B through E
    • All required supplemental and/or supporting documents

     

    NOTE: FAILURE TO PROVIDE A COMPLETE APPLICATION MAY DISQUALIFY
    THE APPLICATION/FUNDING REQUEST. No supplements or changes to an application will be allowed after the application has been submitted, unless specifically approved by the Board of County Commissioners. Individuals with accessibility needs may request a paper application and submit to the staff member listed below.  

    DEADLINE TO SUBMIT COMPLETED AND SIGNED APPLICATIONS IS NO LATER THAN 5:00 PM ET, May 31st, 2024. 

    Please direct any inquiries to;

    Kylie Diaz, VP Community Engagement 

    Visit St. Petersburg/Clearwater

    8200 Bryan Dairy Road Suite 200

    Largo, FL 33777

    Kylie@visitspc.com

    727-464-7231

  • SECTION A: CERTIFICATION AND COMPLIANCE STATEMENT

    (to be completed by authorizing officer/individual)
  • Format: (000) 000-0000.
  • I, * hereby certify that the above-referenced applicant is eligible to receive Capital Project Funding from the Pinellas County Tourist Development Council and Visit St. Petersburg/Clearwater (VSPC) pursuant to Pinellas County Code and the Capital Projects Funding Program Guidelines (Guidelines), and that the following documents are submitted herewith (Capitalized terms shall have the meaning ascribed herein or as set out in the Guidelines).

  • Please find 2024 Capital Funding Program Guidelines Here.

  • Powered by Jotform SignClear
  • I further certify that the information contained in this application is true and correct to the best of my knowledge and that I have read the Capital Projects Funding Program Guidelines and will abide by all legal, financial, and reporting requirements established in the Guidelines, Pinellas County Code, and Florida Statutes.

    I also acknowledge and understand that receipt of any funding for this event is contingent upon a fully executed agreement, prepared by the County, that includes the County’s required terms and conditions.

  • Please have an authorized corporate officer, or if a municipality, an authorized individual sign below.

  • Format: (000) 000-0000.
  •  - -
  • Powered by Jotform SignClear
  • SECTION B: GENERAL INFORMATION

  • Format: (000) 000-0000.
  • Format: (000) 000-0000.
  • 2. Identify the statutorily eligible Capital Project for which you are applying:

  •  - -
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • 7. Projected Capital Project timeline;  
    Start Date: Pick a Date*      
    End Date: Pick a Date*    

  • Rows
  • Rows
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Rows
  • SECTION C: PROJECT DESCRIPTION & ELABORATION

    Please respond completely to each item below. While your answers may summarize information explained in more detail in your economic impact study, it is NOT acceptable to simply refer to this document (i.e., “see economic impact study”).
  • SECTION D: REQUIRED BUDGET INFORMATION

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • SECTION E: CONFLICT OF INTEREST AVOIDANCE

  • SECTION F: PUBLIC RECORDS/TRADE SECRETS

  • Pinellas County Government is subject to the Florida Public Records law (Chapter 119, Florida Statutes), and all documents, materials, and data submitted to it are governed by the disclosure, exemption and confidentiality provisions relating to public records in Florida Statutes. Except for materials that are “trade secrets” or “confidential” as defined by applicable Florida law, ownership of all documents, materials, and data submitted in response to the solicitation shall belong exclusively to the County.

    To the extent that Applicant or Applicant’s Agent desires to maintain the confidentiality of materials that constitute trade secrets pursuant to Florida law, trade secret material submitted must be identified by some distinct method that the materials constitute a trade secret, and Applicant or Applicant’s Agent shall provide an additional copy of the application and supporting documents that redact all designated trade secrets. By submitting any materials that are designated as trade secrets Applicant or Applicant’s Agent acknowledges and agrees:

    (i)    that after notice from the County that a public records request has been made for the materials designated as a trade secret, the Applicant or Applicant’s Agent shall be solely responsible for defending its determination that submitted material is a trade secret that is not subject to disclosure at its sole cost, which action shall be taken immediately, but no later than 10 calendar days from the date of notification or the trade secret designation of the materials will be deemed waived;

    (ii)    that to the extent that the application and/or supporting documents/materials with trade secret materials is evaluated, the County and its officials, employees, agents, and representatives, including Tourist Development Council members, that are in any way involved in processing, evaluating, negotiating, approving any funding request, or engaging in any other activity relating to the competitive selection process are hereby granted full rights to access, view, consider, and discuss the materials designated as trade secrets through the final funding award;

    (iii)    to indemnify and hold the County, and its officials, employees, agents, representatives and Tourist Development Council members harmless from any actions, damages (including attorney’s fees and costs), or claims arising from or related to the designation of trade secrets herein, including, but not limited to actions or claims arising from the County’s non- disclosure of the trade secret materials.

    (iv)    that information and data Applicant or Applicant’s Agent manages may be public record in accordance with Chapter 119, Florida Statues and Pinellas County public record policies. Applicant or Applicant’s Agent agrees that it will implement policies and procedures, to maintain, produce, secure and retain public records in accordance with applicable laws, regulations, and County Policies including but not limited to Section 119.0701, Florida Statutes.

  • ATTACHMENT A

    Economic Impact Study Requirements
  • All Consultants completing economic impact analyses related to a Capital Project for an Applicant must submit as part of the application all information and analyses as detailed in the following Qualifications and Resumes and Consultants Scope of Work sections of this document. It is the County’s intent in requesting the information as outlined in the Consultants Scope of Work section to receive the information and projections in a way that the methodology and calculations utilized in estimating the incremental impacts can be followed, understood and vetted for reasonableness. 

    Qualifications and Resumes

    All Consultants completing incremental economic impact analyses related to the Capital Project for the Applicants must include, as part of the application document, their experience in completing hospitality economic impact analyses/projections for similar facility types as are being proposed by the Applicant. Submitted qualifications must include the following:

    1.    Brief descriptions of the project the Consultant has participated in that are similar to the type of project referenced in the Applicant’s submission. Information should include the project name, location, date services were completed, opening date (if applicable), and description of services provided. Include references for each described project. References should include a contact person, address, phone number, and email. References should be prepared to be contacted.

    2.    Professional resumes of the key individuals assigned to the Applicant’s project; describing education, qualifications, and experience with similar economic impact analyses (including dates worked on each project).

    Consultants Scope of Work

    The economic impact analysis included in the Applicant’s submission shall include the following incremental impact estimates and methodology. Please see the example table in Section 4 detailing how the County prefers to receive the data.

    I. Incremental Direct Impact Projection as a Result of the Capital Project


    A.    Incremental Attendance, Average Length of Stay, Average Attendees per Party, Percentage of Attendees Using the Accommodation Type and Incremental Room Night Projection.

    1.    Consultant shall project;

    1) incremental attendance,

    2) average length of stay,

    3) average attendees per party,

    4) percent using the accommodation type, and

    5) incremental hotel room nights, by year, for the first 10 years the facility is in operation.

    If the Applicant’s Capital Project is an expansion to an existing facility, Consultant shall provide 5 years of historical data, projections until the expansion opens, and 10 years of post-expansion projections. The post- expansion projections must be delineated by base growth and incremental growth. Consultant must provide the information/data utilized to support their projections.

    2.    Consultant shall describe the methodology utilized in the projections. Examples might include, user surveys, data from comparable facilities, etc.

    3.    Consultant shall delineate projections by attendee location, to include:

    a.  Local Attendees/Pinellas Residents (from inside Pinellas County, no hotel room nights)

    b. Day Tripper Attendees (from outside Pinellas, no hotel room nights)

    c.  Overnight Attendees staying in hotel/condo (to include room nights on the days they utilized the proposed project only*)

    d.  Overnight Attendees staying in personal condo/home, camper, or with friend/relatives (to include room nights on the days they utilized the proposed project only*)

    e.  Overnight Professional Performer/Act (professional team players/members, traveling Broadway performers, etc.) staying in hotel/condo

    f.  Overnight Professional Performer/Act (professional team players/members, traveling Broadway performers, etc.) staying in owned condo/home or with friend/relatives

    g.  Other – Consultant may provide other categories utilized in projections if necessary.

    4.    Consultants projections should only capture the overnight stays associated with attending the proposed Capital Project and not include the “shoulder stays”, when attendees may go to the beach or some other area attraction. Utilizing ALL overnight stays may be considered if the Consultant can provide data supporting that the attendees would not have come to the area if the Capital Project were not developed. Meaning, the attendee would not have come to the area if the Capital Project were not developed.

    B.    Incremental Spending Projection

    1.    Consultant shall estimate the spending per attendee per day and the total incremental spending related to the Applicant’s Capital Project for the first 10 years the Capital Project is in operation. As an example, the Consultant may conclude that the spending per attendee for a hotel room is $85 per day (not to be confused with average daily rate for a hotel room). If, on average, the Consultant concludes there are 3 attendees per room, the average rate for the hotel room would total $255 ($85 x 3 attendees per room).

    2.    If the Applicant’s Capital Project is an expansion to an existing facility, Consultant shall provide 5 years of historical estimated spending, projected spending until the expansion opens, and 10 years of post-expansion spending. The post-expansion spending projections must be delineated by base spending and incremental spending.

    3.    Spending estimates shall include the following incremental attendees:

    a.  Local Attendees/Pinellas Residents (from inside Pinellas County) shall not be included in the spending estimates as Local Attendee spending shall be considered a recirculation of spending.

    b.  Day Tripper Attendees (from outside Pinellas County).

    c.  Overnight Attendees staying in hotel/condo.

    d.  Overnight Attendees staying condo/home (owned by attendee, friend or relatives) or recreational vehicle. These attendees would not pay for lodging.

    e.  Overnight Performer/Act Attendees staying in hotel/condo. For example, if the Applicant’s facility is a performing arts center, these attendees would include the traveling performers/stagehands for a Broadway show.

    f.  Overnight Performer/Act Attendees staying condo/home (owned by attendee, friend or relatives). These performer/act attendees would not pay for lodging.

    g.  Other Attendees. The Consultant may include and shall explain any other attendee-type, as appropriate, for their estimates.

    4.    The Consultant must describe the methodology and approach utilized in estimating the spending per attendee per day (surveys of users, comparable facility data, industry-standard/recognized data, etc.).

    5.    Consultant estimates shall include only the daily and total spending associated with days the attendee utilized the Capital Project and not include the “shoulder stays”, when attendees may go to the beach or some other area attraction. Utilizing daily and total spending for ALL days may be considered if the Consultant can provide data supporting that the attendees would not have come to the area if the facility were not developed. Meaning, the attendee would not have come to the area if the facility were not developed.

    II.    Incremental Indirect/Induced Impacts as a Result of the Capital Project


    Utilizing the incremental direct spending impacts, the Consultant shall estimate the indirect and induced spending impacts as a result of the Capital Project. The Consultant shall calculate incremental indirect and induced spending impacts utilizing IMPLAN, RIMS or other industry-standard input/output modeling software.

    If the Capital Project is an expansion to an existing facility, Consultant shall provide 5 years of historical estimated indirect and induced spending, projected indirect and induced spending until the expansion opens, and 10 years of post-expansion indirect and induced spending. The post-expansion spending projections must be delineated by base spending and incremental spending.

    III.  Incremental Tourism Development Tax (TDT) Impact as a Result of the Capital Project


    Consultant shall estimate the incremental Tourism Development Tax (TDT) generated as a result of the Capital Project for the first 10 years the Capital Project is in operation. The TDT is currently 6.0%.

    If the Applicant’s Capital Project is an expansion to an existing facility, Consultant shall provide 5 years of historical estimated TDT, projected TDT until the expansion opens, and

    10 years of post-expansion TDT. The post-expansion spending projections must be delineated by base TDT and incremental TDT.

    IV.  Data Table


    Consultant shall provide estimates, as part of their overall analysis submitted to the County, in the example table format below. The information must be supplied for the first 10 years of operation. If the Applicant’s facility is an expansion to an existing facility, Consultant shall provide 5 years of historical information, projections until the expansion opens, and

    10 years of post-expansion information. The post-expansion information must be delineated by base and incremental.

    Note that the example table includes information for one year and does not assume an expansion. The Consultant must provide all pertinent information related to the Capital Project for the first 10 years of operation. If the Capital Project is an expansion to an existing facility, Consultant shall provide all pertinent information for 5 years of historical operations, projected pertinent information until the expansion opens, and 10 years of post- expansion pertinent information. The post-expansion information must be delineated by base and incremental.

    Below is an example of the Excel data table mentioned above.

     


     [

  • ATTACHMENT B

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Should be Empty: