1. The “Owner(s)” agrees that any and all construction debris will be removed from the site and any common areas travelled on will be left in a clean condition.
2. In the case of an installation requiring a shutdown of all or a portion of the water distribution services within the strata, it is recognized that damages may occur as a result of the shutdown and reactivation of such system and that “The Owner(s) accepts responsibility for such damages.
3. Applicant must ensure contractor vehicles do not block pathways or driveways of neighbours while working in the complex.