• Holden Water Service Line Form

    Submit your results
  •  -
  • Does mailing address differ from Service Address*
  • Browse Files
    Cancelof
  • Do you have any point-of-entry or point-of use treatment on your cold-water kitchen or bathroom taps (softening, filter, or other treatment)?
  • Do your internal building plumbing materials include lead pipes or lead solder?
  • If you are unable to determine the material type or cannot submit the inspection form, would you be interested in scheduling a basement inspection conducted by water system staff and/or their subcontractor to document the material type and size of your water service line?”
  • The Holden Water Department will have a limited number of appointments for home visits to determine the material of your service line for you. If you anticipate needing a site visit, then please submit this form to be added to the waitlist. A representative from the Town’s Engineering Consultant (Tighe & Bond) will contact you with additional details on how to schedule an inspection appointment.

  • Should be Empty: