Site Specific Orientation - OLRT
  • Ottawa OLRT Specific Orientation

  • Image field 54
  • ORIENTATION DATE*
     / /
  • Did you receive a KEV orientation in the last 12 months*
  • Do you have up-to-date Fall Protection/Working at Heights Training?*
  • If you answered "No" to the question above your tasks must exclude working above 6 feet, working on any form of Elevating Work Platform, working in proximity to edges or anywhere a fall hazard exists.

  • 1. Job Hazards*
  • 1.a.) If "Yes" select all Job Hazards that apply:
  • 2. An overview of PCL's policies, practices, and procedures (HSE Policy, Fall protection, Workplace violence and harassment, Environmental)*
  • 3. An overview of PCL's firearms, drug and alcohol policies (review drug and alcohol testing)*
  • 4. Review of the project site plot plan including location of muster areas, first aid stations, spill kits, etc.*
  • 5. Use of a fire extinguisher (Pull, Aim (at base of fire), Squeeze, Sweep)*
  • 6. Medical facilities and services on and off the job (KEV nurse, nearest hospital, closest clinic)*
  • 7. Responsibility to provide first aid coverage*
  • 8. On-site fire prevention, emergency notification, and emergency response plan, report to PCL*
  • 9. Project fall protection plan requirements*
  • 10. Emergency response for spills*
  • 11. Mandatory attendance at HSE Field Meetings, CVIS, JHSC*
  • 12. Regular hours of work, lunch breaks, and coffee breaks*
  • 13. Project Specific Requirements:*
  • 13.a.) If "Yes" select all Project Specific Requirements that apply:
  • 14. A representative of project management was introduced to you and explained their own commitment to HSE on the project*
  • PRE-JOB SAFETY INSTRUCTION (PSI) PROGRAM & JOB HAZARD ANALYSIS (JHA) PROGRAM

  • 15. Pre-Job Safety Instruction (PSI) and the following steps:*
  • 15.a.) recognizing potential hazards?*
  • 15.b.) controlling potential hazards?*
  • 15.c.) minimizing exposure to potential hazards?*
  • 16. The worker should request a PSI and a JHA, if applicable, from his foreman upon leaving this orientation and joining his/her crew. JHA should be part of approved workplan*
  • 17. Additional PPE Requirements (KEV PPE Poster Guide)*
  • This form will be retained on file at the project work site location.

  •  
  • Should be Empty: