Excavation Checklist
Customer Name
*
Job #
*
Checklist
*
Yes
No
Notes
Yard Sign-in Place Equipment Pad Painted
Permit Packet on Site
Skimmer Location Confirmed
Waterfall Pad, RBB, Wing Walls Notches, Confirmed
Pre-Grade for Decking Confirmed
Access Cleanup Discussed w/ Crew Street / Sidewalk Protected Elevation to Mud Seal (description)
Changes to Plan Signed by H/O by Excavation
Layout Correct (length, width, depth)
Check Engineering for Extra Dig Details
Images
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Checklist Completed By
*
Completed Date
*
-
Month
-
Day
Year
Date
Submit
Should be Empty: