You can always press Enter⏎ to continue

Speciality & Fine Food Fair Space Only Submission

DEADLINE: Friday 2nd August 2024
34Questions
  • 1

    This form collates all compulsory H&S information and documentation required from Space Only contractors or Self Build exhibitors. 

     

    Submission of this information must be made by Friday 2nd August 2024.

    Press
    Enter
  • 2

    Under the Construction Design & Management (CDM) Regulations 2015 all Space Only exhibition stands will be classed as CDM “mini-sites” (please see summary of your responsibilities under CDM).  This means that a Construction Phase Plan will need to be submitted which includes the below listed documents. 

    The Construction Phase Plan, to be submitted to Johanna Shirley (via submission of this form) is made up of the 5 following elements: 

    1) Contractor Health & Safety Declaration

    2) Method Statement

    3) Risk Assessment                                              

    4) Stand Plans

    5) Better Stands (Sustainability)

    6) Welfare Arrangement 

    Press
    Enter
  • 3
    Press
    Enter
  • 4
    Press
    Enter
  • 5
    Press
    Enter
  • 6
    Press
    Enter
  • 7
    Press
    Enter
  • 8
    Press
    Enter
  • 9
    Press
    Enter
  • 10
    Press
    Enter
  • 11
    For more information on your roles and responsibilities as a self-build exhibitor, visit https://www.cdm4events.org.uk/exhibitors  For more information on your CDM roles and responsibilities as a space only stand contractor, visit https://www.cdm4events.org.uk/contractors
    Please Select
    • Please Select
    • Principal Designer & Contractor
    • Principal Designer
    • Principal Contractor
    Press
    Enter
  • 12
    • Huge
    • Large
    • Normal
    • Small
    Ok
    quoteCreated with Sketch.
    Ok
    Press
    Enter
  • 13
    • Huge
    • Large
    • Normal
    • Small
    Ok
    quoteCreated with Sketch.
    Ok
    Press
    Enter
  • 14
    Press
    Enter
  • 15
    • Huge
    • Large
    • Normal
    • Small
    Ok
    quoteCreated with Sketch.
    Ok
    Press
    Enter
  • 16
    Press
    Enter
  • 17
    You do not need to submit this now, but a copy must be available and provided if requested
    Press
    Enter
  • 18
    Press
    Enter
  • 19

    As you have less than 5 employees within your company, a written Health & Safety policy isn't required, however we recommend that you have one regardless. For guidance on preparing a Health & Safety policy, please visit http://www.hse.gov.uk/simple-health-safety/policy/index.htm

    Press
    Enter
  • 20

    As you have 5 or more employees within your company, a written Health & Safety policy is required. For guidance on preparing a Health & Safety policy, please visit http://www.hse.gov.uk/simple-health-safety/policy/index.htm

    Press
    Enter
  • 21

    Build-up & Breakdown e-Badge


    To obtain access during Build-up & Breakdown, ALL staff working onsite will need to register to have an e-badge. Within the form you will be required to read the Site Rules & Locations Plan and acknowledge the entry policy.

    Build-up & Breakdown e-badges are valid for the build-up and breakdown periods only. If you have an Exhibitor Badge, you do not require a Build-up & Breakdown e-Badge

    Click here for the build-up & breakdown e-badges form. Please circulate as required.

    Press
    Enter
  • 22

    It is compulsory that all Contractors/Self-Build Exhibitors complete a Method Statement.

    Please click here for a template (if you have your own Method Statement this can be submitted instead). 

     

     

    Press
    Enter
  • 23
    If you don't have an Method Statement, please download and complete the template from the previous page.
    Drag and drop files here
    Select files to upload
    Max. file size: 10.6MB
    Cancelof
    Press
    Enter
  • 24

    ALL Self-Build Space Only exhibitors and Contractors must complete a RISK ASSESSMENT and send it to the Organisers.

    Please click here for a template. This Risk Assessment must cover the activities of all the contractor's company staff, including temporary staff, during the Build-up and Breakdown of the exhibition. If you are a Self-Build exhibitor, then this must also cover your stand activities during the Open Period.

     

    Press
    Enter
  • 25
    If you don't have an Exhibitor Risk Assessment form, please download and complete one from the previous page.
    Drag and drop files here
    Select files to upload
    Max. file size: 10.6MB
    Cancelof
    Press
    Enter
  • 26
    If you don't have an Exhibitor Risk Assessment form, please download and complete one from the previous page.
    Drag and drop files here
    Select files to upload
    Max. file size: 10.6MB
    Cancelof
    Press
    Enter
  • 27

    Please note: subject to information and drawings submitted, a venue appointed structural engineer may need to be employed to check your stand. Further information on costs will be forwarded upon receipt of drawings.

    Press
    Enter
  • 28
    Press
    Enter
  • 29
    Press
    Enter
  • 30

    What is Better Stands?

    Better Stands is a programme aiming to ensure that all core elements of exhibitor stands are reusable. Help us to reduce the environmental impact of Speciality & Fine Food Fair by committing to the Better Stands programme framework and show that your company values being part of sustainable and socially responsible events. Click here for more information.

     What’s in it for me?

    • A better quality, more attractive & sustainable stand
    • Opportunity to promote the sustainable credentials of your brand
    • Smoother, more efficient build up and breakdown periods
    • Lower work hours and reduced construction costs
    • Reduce or eradicate your waste bill

     

    What do I need to do?

    1. Fill out and submit the table on the next page, indicating which categories your stand meets
    2. Ensure the stand reaches at least a bronze level, meaning the stand structure and walls, platform or raised flooring, furniture, equipment and lighting are all reused
    3. Ensure that the submitted stand design clearly communicates how your you or your contractor will meet the Better Stands guidelines
    Press
    Enter
  • 31
    Please complete and attach this below.
    Drag and drop files here
    Select files to upload
    Max. file size: 10.6MB
    Cancelof
    Press
    Enter
  • 32
    Press
    Enter
  • 33
    Press
    Enter
  • 34
    Press
    Enter
  • Should be Empty:
SFFF24 Compulsory Space Only H&S Form Submission
[Edit]
Question Label
1 of 34See AllGo Back
close