This is a material estimate based on information supplied by the contractor.
- Contractor is responsible to have safety perimeters.
-
Contractor is responsible for determining building measurements.
-
Pavers and penetrations are included. Contractors are responsible to remove pavers. D&M can remove for an additional charge.
-
The Roofing Contractor should assume that during the rock removal process holes will be uncovered and created. D&M will use temporary product to patch holes and cuts, but ultimately the Roofing Contractor assumes all responsibility for patching holes and always keeping a watertight roof.
-
Roofing Contractor is responsible for a Crane or Lift if the roof is over 20' in height.
-
There may be mobilization fees for additional trips and set ups.
-
Roofing Contractor will be responsible for all permits.
-
There will be a $30 per square extra charge for ballasted roofs with felt if not disclosed when bidding.
-
The contractor will be responsible for any protection of the ground, and any potential damage for any parking off of asphalt for vacuuming.
-
If the job has unforeseen obstacles, or more than normal rock, change orders may occur.
-
Weekend and holiday work may incur extra costs.
-
Extra time due to waiting for crane, dumpsters, safety, etc may incur extra costs.
-
The contractor is responsible to remove piles or rows of rock for weight. Rock can be removed for extra charges.
-
Sales tax may not be included and quote is good for 30 days.