    To request a quote, please fill out the information below and submit.
  •  - -
    • This is a material estimate based on information supplied by the contractor.

    • Contractor is responsible to have safety perimeters.
    • Contractor is responsible for determining building measurements.

    • Pavers and penetrations are included.  Contractors are responsible to remove pavers.  D&M can remove for an additional charge.

    • The Roofing Contractor should assume that during the rock removal process holes will be uncovered and created. D&M will use temporary product to patch holes and cuts, but ultimately the Roofing Contractor assumes all responsibility for patching holes and always keeping a watertight roof.

    • Roofing Contractor is responsible for a Crane or Lift if the roof is over 20' in height.

    • There may be mobilization fees for additional trips and set ups.

    • Roofing Contractor will be responsible for all permits.

    • There will be a $30 per square extra charge for ballasted roofs with felt if not disclosed when bidding.

    • The contractor will be responsible for any protection of the ground, and any potential damage for any parking off of asphalt for vacuuming.

    • If the job has unforeseen obstacles, or more than normal rock, change orders may occur.

    • Weekend and holiday work may incur extra costs.

    • Extra time due to waiting for crane, dumpsters, safety, etc may incur extra costs.

    • The contractor is responsible to remove piles or rows of rock for weight. Rock can be removed for extra charges.

    • Sales tax may not be included and quote is good for 30 days.