Project Registration Form_Simmons Bank Liberty Stadium  Logo
  • Interested Bidders

    Project Description: Phase 1 includes renovation of the existing East Side Suite Level Two to accommodate moving media and gameday operations from their current West Side location to prepare for Phase 2, as well as other general upkeep, deferred maintenance and site prep elements.  Phase 2 of the project will include the transformation of the stadium’s West Side to dramatically improve the look of the stadium and provide several modern-day premium seating options (including Founders’ Suites, Founders’ Loge Boxes and additional private suites), create a unique interior “party plaza” area for all fans and begin initial perimeter and halo upgrades to create a hospitality space around the stadium.
  • Key Things to Note:

    To be invited as a prime bidder, you must at a minimum, meet the following: 1) You MUST be prequalified and your prequalification limit MUST meet the minimum bonding capacity identified for the specific category. 2) If you are a joint venture, all firms named in the joint venture must be prequalified. 3) You MUST be registered by completing this form.
  • ALL SUBS AND SUPPLIERS NEED A BUILDING CONNECTED PROFILE

    ALL SUBS AND SUPPLIERS NEED A BUILDING CONNECTED PROFILE

    https://app.buildingconnected.com/create-account
  • All Prime Bidders are required to prequalify

    https://www.bartonmalow.com/subcontractors/
  • Should be Empty: