• NC State Mann Hall Renovation Prequalification Form

    State of North Carolina Prequalification Form for First-Tier Subcontractors under CM at Risk
  • Pursuant to the statute, this form gathers information about the subcontractors seeking to qualify for the work and provides a general format for the prequalification criteria. Completing this questionnaire does not guarantee prequalification. Evaluation of the submittal shall be performed by the prequalification committee in accordance with GS 143-128.1, 143-135.8 and the State of NC Prequalification Policy.

  • Submitted to: 

    Contact Name: David Konopka

    CM @ R Firm: Holder Construction Company

    Address: 6210 Ardrey Kell Rd. Suite 400

    City/State Zip Code: Charlotte, NC 28277

    Phone Number: (803)-960-7970

    E-mail Address: dkonopka@holder.com

  • Project:

    Name of Project: North Carolina State University Mann Hall Renovation

    Project Owner: North Carolina State University

    Project Architect: Perkins & Will

    Total Project Budget: $49,500,000

    Anticipated Bid Date: March 2025

    Project Start Date (Approx.): April 2025

    Project Duration: Twenty-Four (24) Months

  • Project Description:

    The “Mann Hall Renovation” project includes a complete interior abatement and demolition scope of the existing building on NC State's main campus, followed by construction of fully re-programmed classroom, academic and study spaces, fourth floor laboratory space, and an ESports arena.

    To support the re-programming of this building, a new mechanical penthouse will be constructed to feed the 4th floor labs and a new elevator shaft will be installed (in addition to replacing the existing cab within a separate shaft). New electrical and mechanical equipment will be required, including replacing the existing transformer, and new fiber will be pulled from the existing manhole to support Esports needs.

    NC State is currently under contract (as part of a separate Mann Hall related project) to replace the exterior glass and perform structural repairs, this scope is scheduled for completion August 2024.

  • NOTICE TO ALL SUBCONTRACTORS: All sections of this Part A: Master Prequalification Form (Annual Submittal) must be provided ONCE A YEAR and filled out in its entirety.  This form will expire on June 30th of each year and requires an update after July 1st.  If any sections are not complete, then the prequal may be rejected.  A separate Part B: Project Specific Supplement is required for each specific project.   Part A and Part B will be evaluated together for the specific project. NOTE*** IF you have already completed a Part A: Master Prequalification (Annual Submittal) form for State projects since July 1st, 2024 - please let your trade contract know by sending via email and we can provide only Part B for completion / submission.

  • Part A - Master Prequalification Form (Annual Submittal)

  • 1. Main Office Location & Company Contacts

  • 2. Business Type

  • 3. Licensing Information

    (Please provide all North Carolina professional licenses required for you to perform your services.)
  •  
  • 4. Type of Scope Performed, Average project size (in terms of revenue), Largest project size (in terms of revenue)

    List all Scopes of Work for which you would request prequalification review in the upcoming year (i.e. if you perform several different scopes such as Drywall/Ceilings, Paint, Flooring, etc., you would list as Scope #1, Scope #2, Scope #3)
  •  
  •  
  •  
  • 5. Size of Company

  • 6. Current Workload

  • 7. Safety

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Does your company have a dedicated safety individual who inspects job sites on a regular basis? If yes, please provide name and contact information for this individual below:

  • 8. Litigation, Claims, Criminal Convictions, & Administrative Actions

  • 9. Historically Underutilized Business (HUB) Plan

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • SUPPLEMENTAL INFORMATION

    Required Supplementary Information that needs to be included at the same time the prequalification form is submitted.
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Part B - Project Specific Supplement

  • 1. Information

  • 2. Updated Company Information

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • 3. Project Specifics

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Signature

  • By signing this document, you are acknowledging that all answers are true to the best of your knowledge.  Any answers found to be falsified will bar you from being prequalified on this project.

  • Powered by Jotform SignClear
  • Should be Empty: