• NC State Mann Hall Renovation Prequalification Form

    State of North Carolina Prequalification Form for First-Tier Subcontractors under CM at Risk
  • Pursuant to the statute, this form gathers information about the subcontractors seeking to qualify for the work and provides a general format for the prequalification criteria. Completing this questionnaire does not guarantee prequalification. Evaluation of the submittal shall be performed by the prequalification committee in accordance with GS 143-128.1, 143-135.8 and the State of NC Prequalification Policy.

  • Submitted to: 

    Contact Name: David Konopka

    CM @ R Firm: Holder Construction Company

    Address: 6210 Ardrey Kell Rd. Suite 400

    City/State Zip Code: Charlotte, NC 28277

    Phone Number: (803)-960-7970

    E-mail Address: dkonopka@holder.com

  • Project:

    Name of Project: North Carolina State University Mann Hall Renovation

    Project Owner: North Carolina State University

    Project Architect: Perkins & Will

    Total Project Budget: $49,500,000

    Anticipated Bid Date: March 2025

    Project Start Date (Approx.): April 2025

    Project Duration: Twenty-Four (24) Months

  • Project Description:

    The “Mann Hall Renovation” project includes a complete interior abatement and demolition scope of the existing building on NC State's main campus, followed by construction of fully re-programmed classroom, academic and study spaces, fourth floor laboratory space, and an ESports arena.

    To support the re-programming of this building, a new mechanical penthouse will be constructed to feed the 4th floor labs and a new elevator shaft will be installed (in addition to replacing the existing cab within a separate shaft). New electrical and mechanical equipment will be required, including replacing the existing transformer, and new fiber will be pulled from the existing manhole to support Esports needs.

    NC State is currently under contract (as part of a separate Mann Hall related project) to replace the exterior glass and perform structural repairs, this scope is scheduled for completion August 2024.

  • If your firm is interested in prequalifying for this project/phase, please check the box for your trade(s). This is a preliminary list of Bid Packages and may change based on response and qualified bidders.*
  • NOTICE TO ALL SUBCONTRACTORS: All sections of this Part A: Master Prequalification Form (Annual Submittal) must be provided ONCE A YEAR and filled out in its entirety.  This form will expire on June 30th of each year and requires an update after July 1st.  If any sections are not complete, then the prequal may be rejected.  A separate Part B: Project Specific Supplement is required for each specific project.   Part A and Part B will be evaluated together for the specific project. NOTE*** IF you have already completed a Part A: Master Prequalification (Annual Submittal) form for State projects since July 1st, 2024 - please let your trade contract know by sending via email and we can provide only Part B for completion / submission.

  • Part A - Master Prequalification Form (Annual Submittal)

  • 1. Main Office Location & Company Contacts

  • Format: (000) 000-0000.
  • Format: (000) 000-0000.
  • Format: (000) 000-0000.
  • 2. Business Type

  • Business Type (check one)*
  • Indicate your NC Statewide Uniform Certification (SWUC):*
  • Is your firm registered with the Department of the Secretary of State to conduct business in the State of North Carolina?*
  • Is your firm owned or controlled by a parent or any other organization?*
  • Confirm that your company can demonstrate compliance with insurance coverages which meet or exceed the minimum requirements of State Construction Manual OC-15 Article 34. Workers Compensation Insurance as required by law and Employer's Liability Insurance Coverage with minimum limits of $100,000. Comprehensive general liability with minimum limits of $500,000 per occurrence for bodily injury and $100,000 per occurrence/$300,000 aggregate for property damage. Please attach a copy of your insurance certificate in the SUPPLEMENTAL INFORMATION section near the bottom of the form:*
  • 3. Licensing Information

    (Please provide all North Carolina professional licenses required for you to perform your services.)
  • NC License Type (check box)*
  • Rows
  • Has any license ever been denied or revoked?*
  • 4. Type of Scope Performed, Average project size (in terms of revenue), Largest project size (in terms of revenue)

    List all Scopes of Work for which you would request prequalification review in the upcoming year (i.e. if you perform several different scopes such as Drywall/Ceilings, Paint, Flooring, etc., you would list as Scope #1, Scope #2, Scope #3)
  • Rows
  • Rows
  • Rows
  • 5. Size of Company

  • 6. Current Workload

  • 7. Safety

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Does your company have a dedicated safety individual who inspects job sites on a regular basis? If yes, please provide name and contact information for this individual below:

  • Format: (000) 000-0000.
  • Does your company have a Written Safety Program and Plan in compliance with current OSHA requirements for your scope of work (Y/N):*
  • Does your company provide weekly training to your onsite employees? (Y/N):*
  • Does your company perform weekly safety inspections on the jobsite? (Y/N):*
  • 8. Litigation, Claims, Criminal Convictions, & Administrative Actions

  • Has your company filed any claims against a CM at Risk or General Contractor within the last five years, whether resolved or still pending resolution?*
  • Has your company been involved in any judgements, claims, arbitration or mediation proceedings, or suits within the last five years, whether resolved or still pending resolution?*
  • Has your company ever failed to complete work awarded to it or has your company's work been supplemented by a CMAR or GC?*
  • Have you ever paid liquidated damages on any project?*
  • Has your bonding company had to take any of the following actions in the last 10 years: Project technical support, Payments to vendors, Supplement work on a contract, or complete a contract for your company?*
  • Has a Bid Bond ever been collected upon on a project your company bid in the last 5 years?*
  • Has your present company, its officers, owners or agents ever been convicted of charges relating to conflicts of interest, bribery, or bid-rigging?*
  • Has your present company, its officers, owners, or agents ever been barred from bidding public work in North Carolina?*
  • 9. Historically Underutilized Business (HUB) Plan

  • Does your company currently have a documented plan for engaging subcontractor participation from Historically Underutilized Businesses?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • SUPPLEMENTAL INFORMATION

    Required Supplementary Information that needs to be included at the same time the prequalification form is submitted.
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Part B - Project Specific Supplement

  • 1. Information

  • 1.d Does your firm intend to Partner or Joint Venture with another Subcontractor for this Project:*
  • 2. Updated Company Information

  • 2.b Confirm updated bonding letter (within last 30 calendar days) is attached above:*
  • 2.c Have you worked on a project with Holder Construction Company in the last five (5) years?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • 3. Project Specifics

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • 3.b Experience of the Superintendent on this specific type of project is:*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • 3.d Experience of the Project Manager on this specific type of project is:*
  • Signature

  • By signing this document, you are acknowledging that all answers are true to the best of your knowledge.  Any answers found to be falsified will bar you from being prequalified on this project.

  • Should be Empty: