Required Documents
• Licensed Engineer Stamped Construction Drawings
• Passing Structural Analysis or Post-Mod Structural Analysis
• FAA Study Number (or reason why no study has been completed)
• Letter of Intent
• Current State IBC and NEC
• State Licensed Engineer Drawings
• Tower Owner Approved Construction Drawings
• 1A, 2C, FAA approved height
• Survey / Legal Description
• Antenna Structure Registration Number
• Time Stamped Photos of site to confirm no endangered species on site
• Redacted Lease Agreement
• General Contractor and Associated Licenses
- State Licensed GC
- Sub GC
- State Licensed EC (if required)
The above documents may be emailed to simplecellpm@outlook.com or mailed to the above mailing address. All documents will be reviewed and approved or rejected within 10 days of approved submittal request confirmation email.
Approved permits are null and void one year after approval date.