Daily Trenching & Excavation Safety Checklist
PCL HSE Operating Procedures (Procedure HSEOP-05-04)
Company Name
*
Excavation Location
*
Project Name
*
Please Select
BCH_PRINCE_GEORGE_2222446
BCH GDK Substation Demo-2222423
BCH F25 Priority Pavin-2222417
West Richmond Pavilion -2222438
LEC - UHRC 2226039
BCIR SCIR PH.1-2222439
CSRC
BCH LMS TruckStorage
Project #
*
Please Select
2222446
2222423
2222417
2222438
2226039
2222439
2220074
2220061
2220059
2222287
Depth
*
Width
*
Length
*
Select Soil Type
Stable Rock
Type A
Type B
Type C
Checklist
*
Rows
Yes
No
N/A
Comments
Slope ratio correct?
Shoring installed as per design?
Shielding in place?
Access/Egress provided?
Barricades erected?
Water removed / Seepage controlled?
Traffic control in place?
Spoil Pile 3 feet (1 m) from edge?
Any cracks in walls?
Signs of caving or sloughing?
Areas of unusually weak soil?
Weather threatening?
Slope ratio:
blanks
*
to
blank
*
.
Atmospheric Check Results (if applicable):
*
Rows
Oxygen (%)
Explosimeter (%)
Toxics (PPM)
Time
Initials
1
2
3
4
5
6
Competent Person (Name)
*
Competent Person (Signature)
*
Type of Inspection
*
Initial
Subsequent
Time of Initial/Subsequent Inspection
*
-
Month
-
Day
Year
2 digit month, 2 digit day, 4 digit year
Date
Date
*
/
Month
/
Day
Year
2 digit month, 2 digit day, 4 digit year
Date