• Fall Protection Plan

    • 1. Description of Task 
    • Date Fall Protection Plan Developed*
       / /
      2 digit month, 2 digit day, 4 digit year
    • Task Start Date*
       / /
      2 digit month, 2 digit day, 4 digit year
    • Task Completion Date (Estimate)*
       / /
      2 digit month, 2 digit day, 4 digit year
    • 2. Fall Hazards Accessing Work Area 
    • Are there fall hazards accessing work area?*
    • 3. Task Fall Hazards (Identify fall hazards) 
    • Hazards
    • Edge Exposure Items
    • Fall Hazard Considerations
    • Describe the Hazards(s) including specific dimensions, locations, levels and detail appropriate controls below

    • 4. Prevention of Dropped Objects 
    • Image field 144
    • Using the Hierarchy of Controls (above) identify system used to prevent dropped objects*
    • 5. Fall Protection Systems  
    • Image field 178
    • Using the Hierarchy of Controls (above) identify fall protection systems used*
    • 6. Anchorage 
    • Identify method used to determine adequacy of anchorage points.

    • 7. System Components 
    • Select the system components to be used, consider the Hierarchy of Controls

    • Image field 183
    • Anchorage Components
      Rows
    • Basic Components
      Rows
    • *E4 or E6 energy absorber?

      E4 - 100-254 lbs (Worker + Tools + Equipment)
      E6 - 200-386 lbs (Worker + Tools + Equipment)

      *E6 Energy Absorbers (EAD) add distance to the total Clearance Required (CR).
      *Refer to Energy Absorber tags/specifications for deployment lengths, this amount is added to the (EAD) portion of the calculation below.

      *If E6 shock absorber is used, be aware that additional clearance distance will be needed to accommodate the additional deployment length, see manufacturer specifications.

    • 8. Calculate Required Distance 
    • Step 1 → Calculate the Free Fall Distance (distance worker falls before engaging the system)

      Step 2 → Calculate the Clearance Required (distance required to prevent worker from striking closest obstruction below)

      Step 3 → Calculate Clearance Available (distance available to the nearest obstruction below)

       

      Identify key variables using the diagram & chart below.

    • Image field 173
    • 1. Calculate Free Fall Distance

      HD + LL - AE = FFD
    • * +* - *        

    • Verify that calculated Free Fall Distance (FFD) is less than the maximum allowable Free Fall Distance. See manufacturers manual.

    • 2. Calculate Clearance Required

      LL + EAD + HW + SM = CR
    • * +* + * + *

    • Verify that tallest worker's height is used (HW) to calculate the Clearance Required (CR).

    • 3. Calculate Clearance Available

      HH + AE = CA
    • * +*        

    • Verify that the Calculated Clearance Available (CA) is greater than the Calculated Clearance Required (CR).

    • Verify that:*
    • 9. Procedures 
    • 10. System Inspection 
    • All equipment must be inspected and maintained as per manufacturer’s instructions.
    • 11. Rescue Plan 
    • Identify the method for prompt, safe removal of an injured worker. Rescue plans must be specific to the task. Calling 9-1-1 alone and awaiting the arrival of rescue services is an insufficient emergency response plan. While calling 9-1-1 may be part of a rescue response plan, it is not to be deemed as a primary rescue. The rescue plan may include but is not limited to the methods below.

    • Independent Rescue Items (Complete if selected 'Yes' above)
    • Internal Company Rescue Items (Complete if selected 'Yes' above)
    • External to Company Rescue Items (Complete if selected 'Yes' above)
    • 12A. Workers 
      • Workers must read and sign below acknowledging that they understand that they will comply with this Fall Protection Plan.
      • Workers will confirm they have current End User Fall Protection training.
    • Rows
    • 12B. Fall Protection Plan Approval 
    • The Supervisor(s) responsible for the workers above to verify that;

      • All in crew are adequately qualified, suitably trained, and with sufficient experience, (Competent)
      • Fall Protection Plan meets local legislation and PCL HSEOP 24 requirements
      • They have submitted the completed Fall Protection Plan to PCL Supervision prior to the commencement of the task.
    • Date*
       - -
      2 digit month, 2 digit day, 4 digit year
    • Supervisor 1

    • Date
       - -
      2 digit month, 2 digit day, 4 digit year
    • 12C. PCL Acknowledgement 
    • PCL Project Supervision will sign acknowledging they have received the completed Fall Protection Plan Prior to the Commencement of the task where applicable.

    • PCL Supervisor(s)
      Rows
    • PCL Superintendent(s)
      Rows
    • Should be Empty: