Micrologic Daily Controls Report
Use this form to submit the daily site update reports
Date
*
/
Month
/
Day
Year
Date
What time did work begin on site today?
*
Hour Minutes
AM
PM
AM/PM Option
What time did work end on site today?
*
Hour Minutes
AM
PM
AM/PM Option
Job Name and Project Number
*
Job Address
*
Street Address
Street Address Line 2
City
State / Province
Postal / Zip Code
Your Name
*
First Name
Last Name
Your email
*
example@example.com
Has the work for this site been completed?
*
YES
NO
What did you accomplish today?
What are you going to accomplish tomorrow?
What is blocking your progress? (Missing parts, damaged parts, trade delays, scheduling issues)
Please upload photos of the site, installed equipment for the day, and any discrepancies for the day. (missing concrete, incorrect parts, etc.)
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
How many Pay Lanes for this location?
Please Select
1
2
3
4
Did you have to change out the whole wash controller?
YES
NO
Lane #1: Confirm the following HOMERUN Cat 6 network cables were pulled with ends installed from each endpoint to the new server rack. Check all that apply.
QTY: 2 - Cables from Gate to Server Rack
QTY: 1 - Cable from Kiosk to Server Rack
QTY: 1 - Cable from Digital Menu to Server Rack
QTY: 1 - Cable from LPR Reader to Server Rack
QTY: 1 - Cable from OTT to Server Rack (if Applicable)
Lane #2: Confirm the following HOMERUN Cat 6 network cables were pulled with ends installed from each endpoint to the new server rack. Check all that apply.
QTY: 2 - Cables from Gate to Server Rack
QTY: 1 - Cable from Kiosk to Server Rack
QTY: 1 - Cable from Digital Menu to Server Rack
QTY: 1 - Cable from LPR Reader to Server Rack
QTY: 1 - Cable from OTT to Server Rack (if Applicable)
Lane #3: Confirm the following HOMERUN Cat 6 network cables were pulled with ends installed from each endpoint to the new server rack. Check all that apply.
QTY: 2 - Cables from Gate to Server Rack
QTY: 1 - Cable from Kiosk to Server Rack
QTY: 1 - Cable from Digital Menu to Server Rack
QTY: 1 - Cable from LPR Reader to Server Rack
QTY: 1 - Cable from OTT to Server Rack (if Applicable)
Lane #4: Confirm the following HOMERUN Cat 6 network cables were pulled with ends installed from each endpoint to the new server rack. Check all that apply.
QTY: 2 - Cables from Gate to Server Rack
QTY: 1 - Cable from Kiosk to Server Rack
QTY: 1 - Cable from Digital Menu to Server Rack
QTY: 1 - Cable from LPR Reader to Server Rack
QTY: 1 - Cable from OTT to Server Rack (if Applicable)
Wash Controller: Confirm the following HOMERUN Cat 6 network cables were pulled with ends installed from each endpoint to the new server rack. Check all that apply.
QTY: 2 - Cables from Wash Controller to New Server Rack
QTY: 1 - Jumper Cable between each wash Controller
Where all network cables tested after ends were installed to confirm that they were good?
YES
NO
Why were the network cables not test?
Did you pull a HOMERUN SHIELDED Cat 6 cable from the input load station at the entrance of the tunnel to the new server rack and install cable ends?
YES
NO
Why was the cable for the input terminal not installed?
Did you install the Visual Queue camera on each gate and secure the network cables?
YES
NO
Why were the Visual Queue cameras not installed?
Did you install the LPR camera on each lane and secure the network cables with flex conduit to prevent UV damage to the cable?
YES
NO
Why were the LPR cameras not installed?
Did you install the new ultrasonic sensor on the first arch after the gate eyes in the tunnel, pull wire back to the new server rack and mount the module for the ultra sonic near the new server rack?
YES
NO
Why was the ultrasonic or module not installed?
Did you install the outdoor wireless antenna and run a CAT 6 cable back to the new server rack?
YES
NO
Why was the wireless antenna not installed?
Did you unpack the new server rack and place it in the client's desired location?
YES
NO
Why was the new server rack not unpacked and placed in the desired location?
Did you install the new logic cards in each wash controller?
YES
NO
Why were the logic cards not installed?
Did you install the new start/stop board in the wash controller?
YES
NO
Why was the new start/stop board not installed?
Did you install the new wash controller?
YES
NO
Why was the new wash controller not installed?
Upload picture of new server rack unboxed and placed in desired location.
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of Gate #1 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of Kiosk #1 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of Digital Menu #1 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of LPR #1 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of Gate #2 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of Kiosk #2 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of Digital Menu #2 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of LPR #2 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of Gate #3 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of Kiosk #3 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of Digital Menu #3 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of LPR #3 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of Gate #4 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of Kiosk #4 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of Digital Menu #4 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of LPR #4 Complete
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of OTT Stand complete at Pay Lanes
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload a picture of Input Terminal Complete at Loading Station.
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload picture of Ultra Sonic Sensor Installed.
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload picture of Wireless Access Point Installed.
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload Picture of Logic Cards Installed
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload Picture of Start Stop Card Installed
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Upload picture of New Tunnel Controller Installed.
Upload Photos
Drag and drop files here
Choose a file
Cancel
of
Additional Comments?
Save
Submit
Should be Empty: