• Resilient Maryland AOI 2 Quarterly Progress Report (QPR) Portal

    Welcome! The Resilient Maryland Quarterly Progress Report (QPR) Portal is provided by the Maryland Energy Administration (MEA) to recipients of MEA Resilient Maryland Grant Program, Area of Interest 2: Capital Support awards. Please use this online portal to submit each QPR throughout the life of the Resilient Maryland project, including through any extension periods that are authorized by MEA. Please provide all requested information. If you have any questions about the Portal or reporting requirements, please contact the MEA Resilient Maryland Program Manager by sending an email to grid.mea@maryland.gov.
  • Section 1: Grantee Information

    This section asks for the Grantee's identifying information. Please provide all requested information.
  • Format: (000) 000-0000.
  • Section 2: Project Progress

    This section asks for information about the progress of the Resilient Maryland project. Please provide all requested information.
  • Please Select Your Project Status*
  • Have you submitted your Preliminary Information Report? (due 30 days after grant start date)*
  • Preliminary Information Report

    Within thirty (30) days of the Grant Agreement’s Effective Date, Grantee shall submit to MEA a completed copy of the Resilient Maryland Preliminary Information Report, which must include the following information: 

    • A Project timeline detailing the specific tasks, milestones, deadlines, and strategies that must be completed in order to successfully install the Resilient Facility Power System, as described in Section 5 of Attachment B (Scope of Work);
    • A Project budget that, at a minimum, specifies each expenditure by cost category and line item. The Project budget must incorporate the entire cost of the Project, and include all funding sources for the Project, including the Grant Award amount.
    • Name and address of chosen contractor
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Section 3: Progress Report

    This section asks for more detailed information regarding progress on the project. Requirements of all Resilient Maryland Final Deliverables are found in the Scope of Work (Attachment B) to the Grantee's Resilient Maryland Grant Agreement. Note: Please limit each response to no more than 500 words.
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Is the project still aligned with the approved work plan and schedule?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Section 4: Requests for Reimbursement

    Under Resilient Maryland AOI 2 Grantees are eligible to request for reimbursement for sufficient evidence demonstrating successful completion of the following project milestones: Milestone 1: Final Engineering & Design Completion 2. Groundbreaking 3. Project Completion 4. Performance Verification
  • Project Milestones And Eligible Reimbursement Amounts 

    i) Final Engineering Completion Reimbursement – Up to fifteen percent (15%) of the Grant Award will be available for reimbursement upon verification that Grantee has completed all final engineering and preconstruction work necessary to commence construction of the Project (“Final Engineering Completion”), has applied for any required authorizations, including but not limited to permits or interconnection agreements, required by any applicable authority having jurisdiction over the Project, and has paid any associated required fees.

    ii) Groundbreaking Reimbursement – Up to seventy percent (70%) of the Grant Award (inclusive of the available “Final Engineering Completion Reimbursement”) will be available for reimbursement upon verification that Grantee has Project materials onsite and has commenced the construction process (“Project Groundbreaking”).

    iii) Project Completion Reimbursement – Up to ninety percent (90%) of the Grant Award (inclusive of the available “Final Engineering Completion Reimbursement” and “Groundbreaking Reimbursement”) will be available for reimbursement upon verification that the Resilient Facility Power System has reached Project Completion.

    iv) Performance Verification Reimbursement – The remaining balance of the Grant Award will be available for reimbursement after notification from MEA that Grantee has completed Project Performance Monitoring (“Performance Verification”).  

     

     

     

  • Which of the following Reimbursement Milestone(s) have been complete?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • By signing this invoice, I affirm that the costs for which I have requested reimbursement are directly attributable to the Project Description pursuant to Attachment B and C of the Grant Agreement and that all applicable terms, conditions, and requirements of the Grant Agreement have been met. I affirm that I have correctly itemized all costs on the second page of this Reimbursement Request.

  • SUBMISSION INSTRUCTIONS

    Please review the information that you entered into this form to ensure that it is accurate to the best of your knowledge, information, and belief. Click "Submit" when you are ready to submit the QPR to MEA. If you have any questions or encounter any issues with submitting the QPR, please send an email to the MEA Resilient Maryland Program Manager at grid.mea@maryland.gov and someone from the Resilient Maryland Team will reach out to assist.
  • Should be Empty: