• Image field 1
  • Tower Crane Inspection Checklist - Weekly

    PCL HSE Operating Procedures - Tower Cranes - Procedure HSEOP-02-05
  • For week beginning:*
     - -
  • WEEKLY Service and Maintenance Inspection

  • Check structural bolts and pins (bolts torqued to specifications one week after erection: replace any nuts or bolts which have become loose that were tight initially).*
     - -
  • Check trolley rollers, tracks, slewing rings, and rollers.*
     - -
  • Check all moving parts: Gear, shaft, belt drives, trolley slewing, rollers, tracks, slewing ring, guy ropes, pendant lines, cable clips, thimbles, and ferrules.*
     - -
  • Test Dynamometer (Dial Head) with Test Block. *
     - -
  • Jacking, see tower crane manual for correct procedures: removed and/or covered jacking unit.*
     - -
  • Check vertical plumb bob. *
     - -
  • NOTE

    It is intended that the equipment be checked daily and weekly by the operator. Any defect must be reported under the space left for remarks. The superintendent will in turn notify the project manager and/or PCL Construction Resources Inc., who will see to it that the defect is remedied. This weekly check does not relieve the operator of the responsibility to immediately report to the superintendent any fault. This weekly report is to be retained in the Daily Checklist Book or will be available digitally within the project Egnyte folder.

  •  
  • Should be Empty: