You can always press Enter⏎ to continue
Take-Off Request From
1
Terms and Conditions
*
This field is required.
1. Introduction
Welcome to the Terms and Conditions ("Terms") for the services provided by Pacific Duct Inc. ("Company", "we", "our", "us"). These Terms govern your use of our services, which are described in the Service Agreement ("Agreement") between us and you, the Customer. By engaging our services, you agree to these Terms.
2. Services Provided
2.1 Scope of Services
Pacific Duct Inc. agrees to provide "take-off" services to the Customer, specifically for ductwork and fittings required for HVAC systems. These services are intended for bidding purposes only, and we will only supply an estimation quote for the take-off.
2.2 Exclusions
This Service Agreement specifically excludes hardware, grilles, registers, refrigeration/piping, fire/smoke dampers, and any other types of equipment from the services provided. Additionally, it does not cover submittals and samples.
3. Customer Responsibilities
The Customer agrees to supply all necessary engineering drawings, blueprints, scopes, and specifications (“Drawings”) that detail the HVAC requirements for the construction project.
4.Limitation of Liability
Pacific Duct Inc. shall not be responsible for any miscalculations or inaccuracies in the take-off services provided. The Customer acknowledges that the take-off services are based on the Drawings supplied and that any discrepancies or errors in the Drawings may impact the accuracy of the take-off results.
5. Payment Terms
5.1 Fees
The Customer agrees to pay Pacific Duct Inc. as per the agreed-upon rates and payment terms outlined below.
5.2 Required Deposit
A deposit of $250 is required prior to the commencement of the take-off services. Your deposit covers up to 8 hours of service.
5.3 Additional Fees
Any additional fees incurred beyond the scope of the initial deposit will be invoiced at
$30 per hour
5.4 Deposit and Additional Fees
If Pacific Duct Inc. is awarded the job, the $250 deposit and any additional fees paid will be applied to materials ordered for the project.
5.5 Payment Schedule
For Customers with Accounts:
The deposit and any additional fees will be invoiced and must be paid in accordance with the net terms.
For Customers without Accounts:
The deposit must be paid before services commence. Additional fees will be invoiced upon completion and are due upon receipt of the invoice.
6. Term and Termination
This Agreement shall commence on the effective date and continue until the completion of the services specified herein unless terminated earlier in accordance with the terms set forth. Either party may terminate this Agreement with a written notice if the other party fails to comply with the terms and conditions.
7. Confidentiality
Both parties agree to maintain the confidentiality of all information exchanged in connection with this Agreement, including but not limited to the Drawings and take-off calculations.
8. Amendments
No amendment or modification of this Agreement shall be valid unless made in writing and signed by both parties. No verbal agreements or modifications are permitted.
9. Entire Agreement
This Agreement constitutes the entire agreement between the parties with respect to the subject matter hereof and supersedes all prior agreements and understandings, whether written or oral.
10. Contact Information
For any questions or concerns regarding these Terms, please contact us at:
Pacific Duct Inc.
5499 Brooks St. Montclair, CA 91763 Email: sales@pacificduct.com Phone: 909-635-1335
Previous
Next
Submit
Press
Enter
2
Upload Duct Detail Sheets here.
*
This field is required.
Drag and drop files here
Select files to upload
Max. file size
: 0.2GB
Upload a File
Cancel
of
Previous
Next
Submit
Press
Enter
3
Name
*
This field is required.
First Name
Last Name
Previous
Next
Submit
Press
Enter
4
Company Name
Previous
Next
Submit
Press
Enter
5
E-mail
*
This field is required.
Previous
Next
Submit
Press
Enter
6
Phone Number
*
This field is required.
Area Code
Phone Number
Previous
Next
Submit
Press
Enter
7
Job Name
*
This field is required.
Previous
Next
Submit
Press
Enter
8
Construction Standards Used for this Take-Off
Smacna Standards
UMC Standards
CMC Standards
Special Gauges
Previous
Next
Submit
Press
Enter
9
Material Types Used on this Take-off
G90 Galvanized
Black Iron
304 Stainless Steel
Paint Lock
Aluminum
Previous
Next
Submit
Press
Enter
10
Rectangular Pressure Classes used on this Take-Off
If the Round Pressure Class is not listed, please include it in the Special Instructions or Additional Notes section.
1/2" Positive
1" Positive
2" Positive
3" Positive
4" Positive
1/2" Negative
1" Negative
2" Negative
3" Negative
4" Negative
Previous
Next
Submit
Press
Enter
11
Rectangular End Connections Used for this Take-Off
S&D
Standing S&D
Ductmate 35
JFlange
TDC
Previous
Next
Submit
Press
Enter
12
Rectangular Seam Fab Construction
Per Smacna
Snap-Lock
Pittsburg
Lap
Mig Welded
Previous
Next
Submit
Press
Enter
13
Rectangular Liner Used on this Take-Off
1/2" Liner
1" Liner
1-1/2" Liner
2" Liner
3" Liner
Previous
Next
Submit
Press
Enter
14
Rectangular Duct - Inner or Outer Dimensions
ID
OD
Previous
Next
Submit
Press
Enter
15
Rectangular Double Wall
1" Liner
1-1/2" Liner
2" Liner
I.D.
O.D.
Previous
Next
Submit
Press
Enter
16
Round Pressure Classes used on this Take-Off
If the Round Pressure Class is not listed, please include it in the Special Instructions or Additional Notes section.
1/2" Positive
1" Positive
2" Positive
3" Positive
4" Positive
1/2" Negative
1" Negative
2" Negative
3" Negative
4" Negative
Previous
Next
Submit
Press
Enter
17
Round End Connections Used for this Take-Off
M/F Slip
Dura-Flange
Angle Ring
Raw x Raw
Previous
Next
Submit
Press
Enter
18
Round Seam Fab Construction
Spot Weld
Mig Wire Welded
Previous
Next
Submit
Press
Enter
19
Round Liner Used on this Take-Off
1" Internal Liner
Previous
Next
Submit
Press
Enter
20
Exposed
YES
NO
Previous
Next
Submit
Press
Enter
21
Misc.
Beaded 12" O.C.
Cross Break
Wrapped Ends
Bagged Fittings
Sealed
Previous
Next
Submit
Press
Enter
22
Special Instructions / Additional Notes
Previous
Next
Submit
Press
Enter
Should be Empty:
Question Label
1
of
22
See All
Go Back
Submit