• Is this project certifiying with Passive Hose, LEED, or similar?*
  • HRV/ERV fully installed and connected to ducting system.*
  • HRV/ERV plugged in to 240V/60Hz power, and in running condition.*
  • Control is wired, and system operating at control unit on wall.*
  • Where applicable, boost switches are connected or synced, and operating.*
  • All ducts are connected, system installed per design specification.*
  • All Diffusers and Register Covers are installed.*
  • All Diffusers and Register Covers arer accessible for measurement of flows by agent using a flow hood.*
  • Ladder or equiv. is available so that agent can access each supply and return point with flow hood.*
  • Intake and exhaust grills are installed at outside of dwelling.*
  • Home substantially completed, with doors and windows installed throughout, and finish work substantially completed.*
  • Filters in HRV/ERV are clean, or new set is available on site.*
  • It is preferable that the homeowner or builder (or representative) is on site during commissioning.*
  • Should be Empty: