Pre-Site Arrival Checklist
Pre-Site Arrival Checklist for Client to Complete
Today's Date
*
-
Month
-
Day
Year
Date
Hour Minutes
AM
PM
AM/PM Option
Company Name?
*
Person Completing this form?
*
First Name
Last Name
Email
*
example@example.com
Phone Number
*
Please enter a valid phone number.
Is this the same person CCS should contact during the project if we have questions or concerns about this project?
*
YES
NO
Client Contact
Who does our team contact if we have questions during the project?
On Site Contact Name
Phone Number
Please enter a valid phone number.
Email Address
example@example.com
Site Address
*
Street Address
Street Address Line 2
City
State / Province
Postal / Zip Code
Back
Next
Save
Has all concrete/asphalt work been completed for the whole site?
*
YES
NO
What concrete/asphalt work is left to be completed?
Back
Next
Save
Is the building dried in and secure with windows and doors?
*
YES
NO
What remains to be done so the building is dry and secure?
Back
Next
Save
Has the wash bay had all wall paneling installed on the ceiling and walls?
*
YES
NO
What remains to be done so the wash bay paneling installation is complete?
Back
Next
Save
Is the wash bay and equipment room free of debris and ready for equipment installation?
*
YES
NO
What remains to be done so the wash bay and equipment room are clear?
Back
Next
Save
Is the vacuum lot clear of debris and ready for installation
*
YES
NO
What remains to be done so the vacuum lot will be clear?
Back
Next
Save
Does the site have permanent power?
*
YES
NO
What remains to be done so the site has power?
Back
Next
Save
Does the site have a permanent water source running into the building?
*
YES
NO
What remains to be done so the site has a permanent water source?
Back
Next
Save
GC Site Supervisor
Who does our team contact if we have questions during the project?
On Site Contact Name
*
Phone Number
*
Please enter a valid phone number.
Email Address
*
example@example.com
Back
Next
Save
Site Photos
Please upload current photos for each of the areas listed below.
Pay Lanes
*
Take/Upload Photo
Drag and drop files here
Choose a file
Cancel
of
Entrance Drive Lane Before the Wash Bay
*
Take/Upload Photo
Drag and drop files here
Choose a file
Cancel
of
Wash Bay Loading Area
*
Take/Upload Photo
Drag and drop files here
Choose a file
Cancel
of
Wash Bay Half Way into the Tunnel
*
Take/Upload Photo
Drag and drop files here
Choose a file
Cancel
of
Wash Bay 20' Below the Exit
*
Take/Upload Photo
Drag and drop files here
Choose a file
Cancel
of
Exit Drive lane from the Wash Bay
*
Take/Upload Photo
Drag and drop files here
Choose a file
Cancel
of
Equipment Room Exit End
*
Take/Upload Photo
Drag and drop files here
Choose a file
Cancel
of
Equipment Room Middle
*
Take/Upload Photo
Drag and drop files here
Choose a file
Cancel
of
Equipment Room Entrance End
*
Take/Upload Photo
Drag and drop files here
Choose a file
Cancel
of
Office/Lobby
*
Take/Upload Photo
Drag and drop files here
Choose a file
Cancel
of
Vacuum Lot from Entrance End of the Building
*
Take/Upload Photo
Drag and drop files here
Choose a file
Cancel
of
Vacuum Lot from Exit End of the Building
*
Take/Upload Photo
Drag and drop files here
Choose a file
Cancel
of
Back
Next
Save
Important Dates
Please let us know the targeted date for the options below.
Equipment Delivery Date?
*
-
Month
-
Day
Year
Date
Point of Sale Vendor On-Site Date?
*
-
Month
-
Day
Year
Date
Point of Sale System?
*
Please Select
DRB Systems
ICS
Micrologic
Sonny's
Washify
Target Opening Date to the Public?
*
-
Month
-
Day
Year
Date
Back
Next
Save
Additional Comments:
Optional
Save
Submit
Should be Empty: