• Pre-Site Arrival Checklist

    Pre-Site Arrival Checklist for Client to Complete
  • Today's Date*
     - -
  • Format: (000) 000-0000.
  • Is this the same person CCS should contact during the project if we have questions or concerns about this project?*
  • Client Contact

    Who does our team contact if we have questions during the project?
  • Format: (000) 000-0000.
  • Has all concrete/asphalt work been completed for the whole site?*
  • Is the building dried in and secure with windows and doors?*
  • Has the wash bay had all wall paneling installed on the ceiling and walls?*
  • Is the wash bay and equipment room free of debris and ready for equipment installation?*
  • Is the vacuum lot clear of debris and ready for installation*
  • Does the site have permanent power?*
  • Does the site have a permanent water source running into the building?*
  • GC Site Supervisor

    Who does our team contact if we have questions during the project?
  • Format: (000) 000-0000.
  • Site Photos

    Please upload current photos for each of the areas listed below.
  • Take/Upload Photo
    Drag and drop files here
    Choose a file
    Cancelof
  • Take/Upload Photo
    Drag and drop files here
    Choose a file
    Cancelof
  • Take/Upload Photo
    Drag and drop files here
    Choose a file
    Cancelof
  • Take/Upload Photo
    Drag and drop files here
    Choose a file
    Cancelof
  • Take/Upload Photo
    Drag and drop files here
    Choose a file
    Cancelof
  • Take/Upload Photo
    Drag and drop files here
    Choose a file
    Cancelof
  • Take/Upload Photo
    Drag and drop files here
    Choose a file
    Cancelof
  • Take/Upload Photo
    Drag and drop files here
    Choose a file
    Cancelof
  • Take/Upload Photo
    Drag and drop files here
    Choose a file
    Cancelof
  • Take/Upload Photo
    Drag and drop files here
    Choose a file
    Cancelof
  • Take/Upload Photo
    Drag and drop files here
    Choose a file
    Cancelof
  • Take/Upload Photo
    Drag and drop files here
    Choose a file
    Cancelof
  • Important Dates

    Please let us know the targeted date for the options below.
  • Equipment Delivery Date?*
     - -
  • Point of Sale Vendor On-Site Date?*
     - -
  • Target Opening Date to the Public?*
     - -
  • Should be Empty: