SDS25 Contractor Nomination

  • 1
    Press
    Enter
  • 2
    Press
    Enter
  • 3
    Press
    Enter
  • 4

    This form is only for use by exhibitors with Space Only stands. You are noted as having a shell scheme stand package and are therefore not required to fill out this form. If you believe this is in error, please contact ops.sds@montgomerygroup.com.

    Press
    Enter
  • 5

    As soon as you have appointed a Contractor to build your stand, you need to complete and submit this form with their full contact details. We will then send them the Contractor Manual and Site Plan.

     

    It is the responsibility of the exhibitor to ensure that their contractor complies with the exhibition regulations, which includes sending a detailed stand plan to Johanna Shirley for approval before 6 January 2024.

     

    Failure to submit plans in time could result in the Organisers being unable to grant permission to build – no stand construction can take place unless written confirmation from the Organisers or their agent has been issued.

    Press
    Enter
  • 6
    Press
    Enter
  • 7
    Press
    Enter
  • 8
    By ticking yes, you are confirming that you understand that you must complete and send a Construction Phase Plan, which includes: 1) Risk Assessment that covers build up, show open and breakdown periods 2) Method Statement 3) Stand Plans 4) Contractor Health & Safety Declaration 5) Welfare Arrangement Form to Scot-Baker.
    Press
    Enter
  • 9
    Please note that the height limit for the show is 4m except for stands around the perimeter of the Mezzanine Level or on the Gallery Level whereby the height limit is 3m.
    Press
    Enter
  • 10
    Press
    Enter
  • 11
    Press
    Enter
  • 12
    Press
    Enter
  • 13
    Press
    Enter
  • 14
    Press
    Enter
  • Should be Empty:
SDS25 Contractor Nomination
[Edit]
Question Label
1 of 14See AllGo Back