19. Quality:
a. The Subcontractor will achieve “First Time Quality”.
b. It will be the sole responsibility of the Subcontractor to identify and correct all defects to assure “First Time Quality”.
c. All work will be representative of the best of the trade and will include, but not be limited to, their signed Subcontractor Performance Standard and Phase Sheet/Scope of Work. Failure of the Subcontractor to notify SCG of problem areas prior to commencement of work, will indicate acceptance of previous work done by other Subcontractors, as well as, full responsibility for the installation of the work being performed by themselves.
d. The Subcontractor will be responsible for making any adjustments or corrections of their own error, as necessary, to comply with plans, specifications, code inspections, testing and/or third-party inspections performed by in SCG., including the cost of materials, labor, equipment, and re-inspection fees.
e. The Subcontractor will be responsible for repairing or replacing and the costs incurred therein with any work performed as a result of defective materials or labor.
f. The Subcontractor will inspect their own work for defects and quality issues and will take appropriate measures to correct defects and provide a defect-free scope of work.
g. The Subcontractor has included in their Scope of Work the quality control process as outlined below:
h. At a minimum, their program will develop quality control checklists, a quality assurance review process, quality control audits and proper ongoing training to all of the trade partner’s employees and Subcontractors in their trade to assure “First Time Quality”.