• CONTRACTOR PRODUCTION & QC REPORT

  • (ATTACH ADDITIONAL SHEETS IF NECESSARY)

  • DATE*
     / /
  • PROJECT TITLE & LOCATION:

  • FY23 Repair Bldg 2077, Schofield Barrracks

  • WORK PERFORMED TODAY:

    Include a detailed description of work performed today along with corresponding Schedule Activity Number
  • QUALITY CONTROL ACTIVITIES PERFORMED TODAY

  • SUMMARY OF HOURS WORKED

  • JOB SAFETY

  • WAS A JOB SAFETY MEETING HELD THIS DATE? (If yes, attach copy of meeting minutes)*
  • WERE THERE ANY LOST TIME ACCIDENTS TODAY? (If yes, attach copy of OSHA report)*
  • WAS CRANE/MANLIFT/TRENCHING/SCAFFOLDING/HV ELEC/HIGH WORK/HAZMAT WORK DONE? (If yes, attach copy of OSHA report)*
  • WAS HAZARDOUS MATERIAL RELEASED INTO THE ENVIRONMENT? (If yes, attach description of incident and proposed action)*
  • SAFETY REQUIREMENTS MET?*
  • EQUIPMENT/MATERIAL RECEIVED TODAY

  • INSPECTION COMPLETED?
  • CONSTRUCTION AND PLANT EQUIPMENT ONSITE TODAY. INDICATE HOURS USED.

  • DATE*
     / /
  •  