Lay-up and Spring Commissioning Form Logo
  • Lay-up & Spring Commissioning Form

  • This form is designed to remind you of the routine items which should be completed before laying up over the winter and commissioning in the spring.

    Please read through and tick in the appropriate boxes for those items you would like us to attend to. Any items not marked will be assumed as not required.

    On receipt of the completed form a Berthon project manager will contact you to discuss works required.

  • Main Engine and Generator


    The goal of winterising marine engines is to leave them in a condition least likely to suffer damage from frost or corrosion.

    Salt water in the cooling system will encourage corrosion and used oil is acidic, which attacks the internal metal surfaces.  This is easily avoided with a thorough winterisation process.

  • Generator

  • Fuel

  • Plumbing

  • Sails and covers

  • Running Rigging

  • Mast & Spars

  • Seacocks

  • Anodes

  • Underwater Hull

  • Sail Drive, Outdrive Leg/s, Prop/s

  • Auxiliary Outboard Motor

  • Winches / Windlass

  • Storage

  • Gas

  • Electronics 

  • Batteries 

  • Tubular heaters

  • Safety Equipment

  • Valeting

  • Should be Empty: