• Exiting and Entering an Elevated Aerial Work Platform Procedure

    HSEOP-26-02: This procedure will outline the steps to follow when exiting/entering an aerial work platform on a PCL project.
  • PERMIT FOR EXITING/ENTERING AERIAL WORK PLATFORM

  • Date*
     / /
  • AWP Operation:

  • AWP:

  • 6. Pre-use inspection of AWP completed?*
  • 7. AWP operations trained in use of AWP?*
  • Fall Protection:

  • 1. Are workers wearing approved fall protection equipment that allows for 100% tie-off?*
  • 2. Do workers have fall-protection training?*
  • Site and Structure Conditions:

  • 4. Does adjacent structure have an approved tie-off point?*
  • Date*
     / /
  •  