• Account details

  • Site information

  • Contractor or installer information

  • Distribution generator system information

  • Synchronous system

  • Induction system

  • For induction generators only

  • Inverter-based system

  • Single-line diagram

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Site plan

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Synchronous or induction generators additional documentation

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Inverter-based generators additional documentation

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Interconnection requirement acknowledgement

    You acknowledge that you have read and understood BC Hydro's Distributed Generation Technical Interconnection Requirements 100 kW and Below (DGTIR-100), and that you agree to comply with these requirements and design, install, operate and maintain you generator in accordance with applicable governmental and BC Hydro standards and requirements.

  • Non-participation to self-generation program acknowledgement

    You acknowledge that you are not participating in BC Hydro's self-generation program. The generation will not be allowed to inject any power to BC Hydro through point of metering and, thereby, the BC Hydro interconnection approval may require additional generation control measures implemented by us in place. 

    You also acknowledge that the installation will not be eligible for any sort of compensation from BC Hydro.

  • Should be Empty: