The service includes a 50/50 synthetic blend oil. Additional $25 upcharge for using 100% synthetic oil.
Service Checklist: Culver Electric will perform the following services:
- Change Engine Oil
- Change Engine Oil Filter
- Check & Adjust Valves
- Inspect/Replace Air Filter
- Inspect/Replace Spark Plugs
- Inspect Fuel System
- Inspect Exhaust System
- Inspect Enclosure and ensure all openings are unobstructed
- Check Battery, Terminations, Connections, and Water Level
- Check all connections electrical & Mechanical
- Check operation of Battery Charging Equipment
- Simulate a temporary loss of power from the utility company and observe proper operation, if possible (Generator start, transfer, and shut down)
- Check & adjust Generator Voltage and Hz
PLEASE NOTE THAT IN THE EVENT OF EXTENDED GENERATOR USAGE, POWER LOSS OVER 24 HOURS CULVER ELECTRIC RECOMMENDS INSPECTION OF GENERATOR,OIL LEVEL, BETTERY.