    Hot-Work Permit Seek an alternative/safer method if possible!

    This Hot-Work Permit is required for any operation that involves burning, welding, using an open flame, fire- or spark- producing tools, or that produces a source of ignition. This work includes, but is not limited to, welding, brazing, cutting, grinding, soldering, thawing pipe, torch-applied roofing, and chemical welding.

  •  / /
  • THIS PERMIT IS GOOD FOR 24 HOURS

  • Requirements within 35 ft (11 m) of hot work:

  • Requirements for hot work on walls, ceilings, or roofs:

  • Requirements for hot work on enclosed equipment:

  • Requirements for hot work fire watch and fire monitoring:

  • I verify that the above location has been examined, the precautions marked on the checklist above have been taken, and permission is granted for this work.

  •  