• Strømmen QMS: Checklist for installation (general)

  • 1. Has the opening been inspected before installation?*
  • 3. Is the product installed plumb and level?*
  • 5. Is it properly fixed and secured?*
  • 6. Is there any scratches or damages on the profiles or glass units?*
  • 7. Insulated around product?*
  • 8. Silicone around product?*
  • 9. Are all gaskets and glazing beads mounted?*
  • 10. Has the product been adjusted and its functionality tested?*
  • 11. Are the pressure lists and cover caps mounted?*
  • 12. Are the drainage cups mounted?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Date:*
     - -
  • Should be Empty: