AC Daily Trenching and Excavation Checklist
  • DAILY TRENCHING & EXCAVATION SAFETY CHECKLIST

  • Select Soil Type*
  • Slope Ratio Correct?*
  • Shoring installed as per design?*
  • Shielding in place?*
  • Access/Egress provided?*
  • Barricades erected?*
  • Water removed/Seepage controlled?*
  • Traffic control in place?*
  • Spoil Pile 3 feet (1 m) from edge?*
  • Any cracks in walls?*
  • Signs of caving or sloughing?*
  • Areas of usually weak soil?*
  • Weather threatening?*
  • Atmospheric Check Results (if applicable)

  • Rows
  •  / /
  •  
  • Should be Empty: