Section 12 - Installation
Installation dates are to be confirmed at least 4 weeks before the departure from South Africa by the technical crew. Once the installation dates have been confirmed, the required invitation letters, proof of accommodation and domestic transport must be submitted for visa applications.
Installation dates will only be confirmed once the equipment has been placed on site and the account has been settled. Photographic confirmation is required and can be submitted via WhatsApp to +27 71 498 8436 or emailed to support@dryersforafrica.co.za.
Where necessary and if possible, the Seller will try to accommodate successive installations within a certain period, based on flights and staff availability and this is for the sole discretion of the Seller.
Travel bookings are actioned by a third-party contractor to ensure the relevant policies and safety measures are in place to protect both Buyer and Seller.
Domestic flights within the country of installation where the travel distance is more than 200km by car requires domestic flights (where available). Should these flights be unavailable, booking assistance will be required.
Transfer times in excess of 5 hours will require a layover. All quoted installation times will include travel time.
Undisclosed distances and/or travel requirements affecting the duration of the installation will be billed accordingly and will affect site times.
Technicians will not be dispatched until the completed Installation Readiness Guide (IRG) along with letters of invitation and any supporting visa application documentation, domestic travel arrangements, proof of suitable and comfortable accommodation, and transfer arrangements have been received, the account settled and other requirements have been submitted.
Accommodations for the technical crew are to be safe, secure and clean. Standard single-occupant rooms with proper air control for the duration of their stay are required. Where necessary, mosquito netting is to be provided.
Meals and non-alcoholic beverages for the duration of the installation are for the Buyer's account unless indicated otherwise. 3 full meals per day are to be provided,including lunch. Any alcohol consumption is prohibited and must be reported to management promptly.
Site times are calculated at 8 hours, excluding an hour for tea/lunch. Times are to be adhered to unless the senior technician indicates otherwise. Failure to prepare the site, resulting in deviations from the calculated times will be penalised. This is not negotiable.
Inaccurate information provided in the Installation Readiness Guide will result in ‘Tools Down’ while incurring penalties until compliance is confirmed.
Travel time to and from the site and/or airport falls within the 8-hour limit. Additional time on site will be invoiced and settled without delay. Travel times between accommodation and site, more than 60 minutes (one way) must be disclosed. This will affect installation times.
Overtime rates on weekends will apply.
Transfers to and from the airport, accommodation and site are for the Buyer's account. The senior technician can decline unsuitable transfer arrangements if there are safety concerns. Any delays due to inadequate travel arrangements will be billed accordingly and additional expenses incurred will be for the Buyer's account.
Only enclosed, roadworthy and safe passenger vehicles are to be utilised when transporting technicians, operated by licensed drivers with applicable insurance. Vehicle sharing impacting the technical team’s ability to operate efficiently or delays, transfers etc. are not permitted. Take into account that the technicians travel with toolboxes and they need to be considered when scheduling transportation. ALL domestic transport costs are for the Buyer's account.
Equipment not at the final location at the time of arrival of the technicians, causing delays in the installation will be penalised. Delays affecting the duration of the stay will be billed accordingly.
Local labour for Buyers' account may be requested for certain tasks and will be communicated.
All required vaccinations have been administered to the technical team, including the COVID-19 vaccine.