• Wendy's Daily Progress Update

    Please complete this at the end of every day
  • Format: (000) 000-0000.
  • Deliverable Photos Needed:

    • Rack installation including properly installed Backer board
    • Equipment installed correctly via the provided matrix diagram
    • Picture of provided cables installed properly in the patch panel
    • Front and back photos of cable management
    • ENVR correctly patched into switch and functional
    • Old equipment removed from the wall and left in box on site. Abatement completed and pictures provided
    • Pictures of J-Hooks
    • Picture of each drop location showing proper labeling and color of jack 
    • Each Drop showing cable passing testing or PDF of all drops passing
    • Picture of any extra patch cables that were provided being left on site in the rack 
    • Neat and clean kitchen prior to leaving the site.