• Greer CPW Electric Vehicle Incentive Application

  • Format: (000) 000-0000.
  • Electric Vehicle Incentive:

    GCPW set aside funds to help customers install Electric Vehicle charging (level 2 or equivalent) equipment or 240v plugs. These monies will be available on a first come first serve basis. Credit will be limited to current residential installations. 

    • A $250 credit will be given to customers that install 240V (level 2 or equivalent) electric vehicle charging equipment or a 14-50 receptacle with a 240v mobile charger.
    • GCPW will inspect and verify installation prior to credits being given. (Note: This is for the purpose of visually identifying the charger and the amperage only).
    • A copy of registration showing ownership/lease of an electric vehicle with a minimum battery size of 40kWh required. 
    • One vehicle charger installation credit allowed per residential meter/account. 
    • All electrical wiring must be permitted through the City of Greer or the appropriate County having jurisdiction. 
    • GCPW reserves the right to discontinue this incentive or deny credit reimbursement for failure to meet the terms or intent of this incentive.
  • Do you own an electric vehicle with a minimum battery size of 40 kWh?*
  • Have you installed a wall mounted level 2 or equivalent charging equipment or a 240V receptacle with a 240V charging cable? ($250 credit)*
  • Wall Charger examples:

    Receptacles and Mobile Charging examples:

  • Has all the electric wiring to the charging equipment or receptacle been permitted through the City of Greer or the appropriate county having jurisdiction?*
  • Do you agree to allow Greer CPW to inspect and verify your installation, permits, and charging equipment?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Should be Empty: