AWS- Job Hazard Analysis (JHA) Form Logo
  •  - -
  • JHA Form

    If you fill out your own JHA form please take a picture using the above widget and then scroll to bottom of this page and click 'Submit'. If you do not have an in-house JHA form please continue using this form.
  •  -

  • Job Hazards & Controls

    Check all that apply and give details as needed in the Tasks, Hazards and Controls section of this form
  • The Following Hazards and Controls were Identified and Discussed










  • Daily Rigging Sheet Information
     
    This is a daily inspection of the rigging used by each foreman on the jobsite.
     
    Lift: This is the lift or reason why the rigging is being used.
    Crane Used: The crane or equipment performing the operation with use of rigging.
    Specification: Engineer Specifications or Shop Drawings.
    Rigging Used: All rigging used to include the type and serial numbers on tag.
    Size: Length of rigging
    Capacity: Weight limit on rigging
    Condition: The inspection of the rigging for any defects and state if it is ok or defective.
     
    Notes: If any rigging is defective be sure to note damage and that the equipment has been replaced

  •  






  • Job Hazard Analysis (JHA) Form

    Each job is required to complete a Job Hazard Analysis. All subcontractors must complete a Job Hazard Analysis with all crew members and visitors who enter the work area.
  • Should be Empty: