Scaffold inspection
Work Site
*
Work Site for PDF
Work Site (OLD)
RW-541 Sunridge Mall Snow Removal
RW-705 Bridgeland Improvements Project
RW-752 Carstairs Hwy 2A Improvements
RW-760 15th Avenue Mobility Improvements
RW-764 Sunnyside Flood Barrier 2025/26
RW-768 Saddlebrook Pavement Rehab
RW-771 CFD Apparatus Slab Replacement
RW-773 14th Street NW Pathway
RW-774 18th St SE Pathway
RW-778 Bow View Manor Emergency Work
RW-789 COC Tier 2 Patches 2026
RW-794 CT Concrete Placement & Repair
UG-728 Mandalay Phase 5B
UG-730 NWIC Phase 2 (Kensington)
UG-743 Lawrey Gardens Outfall B76
UG-747 Cochrane Emergency Repairs
UG 754 - Water maintenance RFSO
UG-759 - Fish Creek Sludge Forcemain Upgrades
UG-761 Bow River Siphon Line Stop & Isolation Valve
UG-765 52 St and Memorial Dr. NE Feedermain
UG-766 2025 Watermain Replacement
UG-777C Pipe Diver Installation
UG-777D Aidrie 900 Feeder Main Repair
UG-779 Phase 4 Bearspaw Feedermain Repairs
UG-780 250mm Sanitary Main Replacement
UG-781 SS B42 Outfall Phase 1
UG-782 CIPP Lining
UG-784 Shepard Energy Centre-Repair SOR
UG-785 Discovery Ridge Lift Station
UG-786 Bowness Park Cross Tie
UG-787 Linear Replacements
UG-788 154 Wimbledon Cres SW
UG-792 9 Ave SW Watermain Improvements
UG-793 Applewood Lift Station
UG-797 Mandalay Estates Phase 2
CP-676 CP Rail Work
36 Avenue Yard
Balzac Shop
Spring Garden Lay Down
Add Work Site if not shown
Company
*
LBCO
Add company name if not shown
Name of Inspector
*
First Name
Last Name
Date of Inspection
*
-
Month
-
Day
Year
Date
Type of Scaffold
*
Frame scaffolding
Single or double pole scaffolding
Tube and clamp
Ladderjack scaffolding
Pump Jack scaffolding
Needle beam scaffolding
Other
General Requirements
*
Rows
Yes
No
if no, next step
Is the supporting surface where the scaffold is erected capable of withstanding its weight?
Is the scaffold erected on dirt? If YES are mud sills installed under each point of contact to support load?
Is there any potenitial for contact with exposed electrical equipment and conductors ( l.e overhead energized power and communication lines)?
Are the workers trained and supervised in how to confirm structural capability?
Has the scaffold been installed as specified by the manufacturer's instructions, applicable standards, and engineers requirement ( i.e..., have all the cross braces been installed)?
If applicable, are the manufacturers or engineers instruction readily on site?
Has the scaffold been inspected before each use ( i.e.., yellow tag and red tag system ) ? Tag current?
Is there any safe way to get on and off the scaffold, such as a ladder ?
Is the scaffold able to withstand the load likely to be imposed on it
Where applicable, have guardrails and toe boards been installed on all open slides where the open space is greater than 30 cm ( 12 in) ( i.e the open space between the platform and the adjacent structure) ?
Are the platforms at least a nominal width of 50 cm (20 in )?
Have the platform been secured against separation from the supporting equipment, structure or surface?
Is the platform fully planked or decked with no gaps greater than 25cm (10 in )?)
Are the ledgers and bearers level and the vertical member plumb?
Is the scaffold height more then three frames tall? If YES are the outriggers firmly attached to the scaffold and stable?
Is there a safe way of getting materials on each platform on scaffold ( i.e.., workers cannot carry materials or equipment up or down a ladder)?
Are the workers required to work below with scaffold? If so, is appropriate protection against falling materials in place?
Do all connections have securty pins in place?
Wood-frame scaffold requirement
Rows
Yes
No
if no next step
Is the lumber used to construct the scaffold graded and marked to the National Lumber Grading Rules for Canadian Lumber ( i.e No 2 or better lumber that is Douglas fir-larch, hemlock-fir, spruce-pine-fir, or coast Sitka spruce)?
Is the lumberfreed of cracks, splits, knots, and damages?
Manufactured scaffold requirement
Rows
yes
no
if no next step
Are all brace, bearers, clamps, and other connection appropriately secure?
Rolling scaffold requirement
Rows
Yes
No
If no, next step
Are wheels and casters locked while workers while are on scaffold?
Is the scaffold designed and intended to be move while a worker is on platform?
Take a picture of the signed and dated inspection tag
Upload or take a picture
Drag and drop files here
Choose a file
Cancel
of
Inspector's Signature
*
Submit